No sub-topics indexed.
Documents in this topic
Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.
Machine-extracted titleNYC-WTC_000168625
Revised change order for installing multi-mode fiber optic cables connecting fan rooms and loading dock areas.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.596
Machine-extracted titleNYC-WTC_000174001
Submission of Change Order #54 for $2,670 for work performed on a time and material basis.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.595
Machine-extracted titleNYC-WTC_000173708
Letter submitting credit change order #14 to remove costs for witnessing an emergency generator field test.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.594
Machine-extracted titleNYC-WTC_000172002
Letter transmits a revised Change Order #6 for $406 to furnish a bullet-resistant door at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.593
Machine-extracted titleNYC-WTC_000173184
Letter submitting change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.593
Machine-extracted titleNYC-WTC_000168369
Letter submitting change order #103 for audiovisual press feed and camera system work on the 1st, 7th, and 23rd floors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.592
Machine-extracted titleNYC-WTC_000168384
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.589
Machine-extracted titleNYC-WTC_000172210
Cover letter submitting Change Order #36 for generator room waterproofing at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.587
Machine-extracted titleNYC-WTC_000171404
Memorandum submitting change order #60 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.586
Machine-extracted titleNYC-WTC_000171346
A change order for engineering work related to DOT camera installation at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.586
Machine-extracted titleNYC-WTC_000171636
Submission of Change Order #69 for additional keys and roof chain installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.586
Machine-extracted titleNYC-WTC_000168411
Letter submitting change order #87 for $1,276 to install a UPS conversion kit in an office at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.585
Machine-extracted titleNYC-WTC_000173643
Letter submitting Change Order #15 for the installation of new sleeve locations on the 23rd floor to support cabling at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.585
Machine-extracted titleNYC-WTC_000168614
Revised change order for installing low voltage switches and D-Sub conductors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.583
Machine-extracted titleNYC-WTC_000168659
Change Order #11 submitted for replacing a hollow metal and glass door at 7 World Trade Center dated October 5, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.581
Machine-extracted titleNYC-WTC_000172218
December 23, 1998 memo submitting Change Order #42 for installing wall washers at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.579
Machine-extracted titleNYC-WTC_000173634
Letter submitting revised Change Order #8 for $11,688.00 to upgrade a door and walls to bullet-resistant standards at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.578
Machine-extracted titleNYC-WTC_000168592
Memo submitting Change Order #31 to furnish and install security wire in conduits at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.578
Machine-extracted titleNYC-WTC_000172161
Cover letter submitting change order #101 for the provision and installation of a wall-mounted Halotron 1 fire extinguisher.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.577
Machine-extracted titleNYC-WTC_000171434
Document containing handwritten calculations and notes regarding total approved costs before the sixth payment for a construction project.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.576
Machine-extracted titleNYC-WTC_000171344
A change order for installation of electrical circuits in executive areas at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.572
Machine-extracted titleNYC-WTC_000171854
Letter submitting Change Order #41 for $16,807.00 for unspecified scope of work at the Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.572
Machine-extracted titleNYC-WTC_000168554
Memo submitting Change Order #48 for installing a new access door and hardware at room 23-51 in 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.571
NYC-WTC_000168348
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.571
Machine-extracted titleNYC-WTC_000172367
Memorandum submitting change order #87 for the installation of a UPS conversion kit at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.571
Machine-extracted titleNYC-WTC_000172194
Contractor submission of change order for power and control wiring at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.570
Machine-extracted titleNYC-WTC_000168588
Contractor submission for change order to install new metal cap flashing with drip return at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.567
Machine-extracted titleNYC-WTC_000168701
Letter submitting Change Order #1 for sheetrock wall offsets at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.566
Machine-extracted titleNYC-WTC_000173871
Credit change order #27 submitted for painting the LAN room instead of installing VCT flooring.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.565
Machine-extracted titleNYC-WTC_000168663
Revised change order for wood door jamb work at 7 World Trade Center dated September 14, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.565
Machine-extracted titleNYC-WTC_000173878
Change order #25 submitted for structural support of microwave dishes on the bulkhead wall at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.564
Machine-extracted titleNYC-WTC_000168390
Change order #094 (revised) for $10,417 to furnish and install automatic air release valve and visual level indicator at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.564
Machine-extracted titleNYC-WTC_000171563
Invoice for change order #109 ($4,482.00) from property owner for electrical and security work at 7 World Trade Center's Mayor's Office of Emergency Management space.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.556
Machine-extracted titleNYC-WTC_000168391
Letter submitting change order #94 to install equipment following a domestic transfer pump test for $7,291.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.554
Machine-extracted titleNYC-WTC_000171567
Invoice for change order #110 ($2,461.00) for work at 7 World Trade Center's Mayor's Office of Emergency Management space, per Port Authority authorization.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.553
Machine-extracted titleNYC-WTC_000168578
Memo submitting revised Change Order #39 for installing equipment racks and RJ45 plates at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.553
NYC-WTC_000173857
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.553
Machine-extracted titleNYC-WTC_000168402
Letter submitting change order #89 for $7,553 to install power and control wiring for the Inergen system in the fuel oil tank room.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.552
Machine-extracted titleNYC-WTC_000168430
Contractor submits Change Order #82 for $8,313 to replace the radio room door with a new blast-resistant door.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.551
Machine-extracted titleNYC-WTC_000168661
Revised Change Order #10 submitted for the installation of a special class I package receiver at 7 World Trade Center dated September 16, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.545
Machine-extracted titleNYC-WTC_000171327
Letter submitting change order #98 to convert press room lights to hard-wired switches at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.545
Machine-extracted titleNYC-WTC_000168649
Change Order #15 submitted for wall sleeve installation at the 23rd floor of 7 World Trade Center dated October 12, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.544
Machine-extracted titleNYC-WTC_000168692
Contractor submission of Change Order #003 for plug mold outlet and A/V work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.544
Machine-extracted titleNYC-WTC_000168652
Credit Change Order #14 submitted regarding field test witnessing for the emergency generator at 7 World Trade Center dated October 12, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.542
Machine-extracted titleNYC-WTC_000168377
Contractor submission for $9,092 to convert press room lights to hard-wired switch legs and eliminate plug-in feeds.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.539
Machine-extracted titleNYC-WTC_000171408
Contractor submission for change order covering wiring installation for auxiliary contacts within existing relays.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.538
Machine-extracted titleNYC-WTC_000171446
Letter dated February 1, 1999, submitting Change Order #64 for work at the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.536
Machine-extracted titleNYC-WTC_000168665
Memo submitting revised Change Order #8 for door modifications at 7 World Trade Center dated September 14, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.535
Machine-extracted titleNYC-WTC_000168346
Letter submitting change order #110 for installing an astragal and sprinkler head at the Mayor's Office of Emergency Management facility.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.533
Machine-extracted titleNYC-WTC_000168611
Contractor submission for change order to provide structural support for microwave dishes on the roof at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS · assignment probability 0.529