No sub-topics indexed.
Documents in this topic
Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.
Machine-extracted titleNYC-WTC_000417579
OSHA asbestos sampling summary for financial district, Oct 2001.
Emergency Management, Office of · Box unavailable · assignment probability 0.651
Machine-extracted titleNYC-WTC_000205208
Summary of OSHA air monitoring results for asbestos, diesel exhaust, and noise exposure at the World Trade Center site as of November 8, 2001.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.649
Machine-extracted titleNYC-WTC_000360727
OSHA air monitoring totals; asbestos and noise data; rubble-pile exposure context.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.648
Machine-extracted titleNYC-WTC_000417634
OSHA asbestos air results through 11/7; rubble-pile monitoring and noise data noted.
Emergency Management, Office of · Box unavailable · assignment probability 0.647
Machine-extracted titleNYC-WTC_000454569
Summary of asbestos air monitoring across financial district and rubble pile sites.
Emergency Management, Office of · Box unavailable · assignment probability 0.647
Machine-extracted titleNYC-WTC_000418687
OSHA asbestos sampling; exposure levels mostly below limits; rubble pile still monitored; noise data.
Emergency Management, Office of · Box unavailable · assignment probability 0.646
Machine-extracted titleNYC-WTC_000330535
Asbestos sampling totals and analyses; rubble pile exposure patterns documented.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.642
Machine-extracted titleNYC-WTC_000267546
OSHA asbestos sampling results summary through 10/23, includes ND to 0.037 f/cc findings.
Citywide Administrative Services, Dept. of · Box unavailable · assignment probability 0.642
Machine-extracted titleNYC-WTC_000279943
OSHA asbestos sampling results for financial district and rubble pile through 10/16/01.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.639
Machine-extracted titleNYC-WTC_000356011
OSHA asbestos and noise sampling results from the rubble pile; PCM analysis results cited.
Fire Department · Box unavailable · assignment probability 0.638
Machine-extracted titleNYC-WTC_000205505
Summary of air monitoring for asbestos, noise, and worker exposure at the World Trade Center site as of November 7, 2001.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.636
Machine-extracted titleNYC-WTC_000290789
Summary of OSHA asbestos air sampling results across financial district and rubble pile areas.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.635
Machine-extracted titleNYC-WTC_000355999
OSHA asbestos, noise, and related samples from the rubble pile and surrounding areas with TEM/PCM analyses.
Fire Department · Box unavailable · assignment probability 0.634
Machine-extracted titleNYC-WTC_000361147
Summary of OSHA asbestos air monitoring results in financial district and rubble pile, with comparisons.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.631
Machine-extracted titleNYC-WTC_000354390
Air monitoring results show asbestos levels largely below PEL with elevated rubble pile samples under analysis.
Sanitation, Dept. of · Box unavailable · assignment probability 0.631
Machine-extracted titleNYC-WTC_000268846
OSHA TEM/PCM-based asbestos monitoring results across Financial District rubble area; results below PEL.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.631
Machine-extracted titleNYC-WTC_000341924
Asbestos and noise monitoring results for rubble pile workers and nearby operations.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.630
Machine-extracted titleNYC-WTC_000341948
642 samples for asbestos with PCM/TEM follow-ups and noise monitoring at rubble site.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.629
Machine-extracted titleNYC-WTC_000188102
Summary of OSHA air monitoring results as of December 11, 2001, detailing asbestos and noise exposure levels at the World Trade Center site.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.629
Machine-extracted titleNYC-WTC_000322705
DDC memo on air quality monitoring results for WTC debris removal, Oct 17, 2001.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.628
Machine-extracted titleNYC-WTC_000322487
Summary of OSHA asbestos air samples in financial district and rubble pile, noting concentrations and detection limits.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.627
Machine-extracted titleNYC-WTC_000356003
OSHA asbestos and noise sampling results from the rubble pile and surrounding area; PCM analyses reported.
Fire Department · Box unavailable · assignment probability 0.626
Machine-extracted titleNYC-WTC_000361047
DDC memorandum on site air quality monitoring, asbestos and other parameters.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.626
Machine-extracted titleNYC-WTC_000341949
635 asbestos samples; PCM exceedances followed by TEM analysis near rubble pile.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.626
Machine-extracted titleNYC-WTC_000330728
OSHA asbestos sampling results across rubble pile and surrounding zones through Oct 2001.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.625
Machine-extracted titleNYC-WTC_000268757
Summary of asbestos sampling results and OSHA limits; includes rubble-pile findings.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.625
Machine-extracted titleNYC-WTC_000388166
OSHA sampling summary for asbestos with PCM/TEM analysis notes and exposure ranges.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.624
Machine-extracted titleNYC-WTC_000432076
Asbestos and noise monitoring results; most exposures below limits.
Unknown Agency · Box unavailable · assignment probability 0.620
Machine-extracted titleNYC-WTC_000357567
OSHA asbestos sampling status; rubble pile results and ambient levels summarized.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.620
Machine-extracted titleNYC-WTC_000277505
OSHA asbestos sampling results and personal samples on rubble pile workers, showing results below limits after TEM refinement.
Fire Department · Box unavailable · assignment probability 0.619
Machine-extracted titleNYC-WTC_000252319
OSHA air sampling results summary for asbestos in financial district; 9/2001–9/21 data.
Environmental Conservation, Dept. of · Box unavailable · assignment probability 0.619
Machine-extracted titleNYC-WTC_000205349
Summary report of OSHA air monitoring samples taken in the financial district and rubble pile, comparing results to permissible exposure limits.
Fire Department · Box unavailable · assignment probability 0.619
Machine-extracted titleNYC-WTC_000341951
OSHA and personal samples report asbestos levels across financial district and rubble pile, comparing PCM and TEM results to OSHA limits.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.619
Machine-extracted titleNYC-WTC_000269111
Summary of asbestos air monitoring results and rubble pile samples with exceedances noted.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.618
Machine-extracted titleNYC-WTC_000388098
OSHA asbestos sampling results summary; widespread results well below PEL.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.618
Machine-extracted titleNYC-WTC_000268848
Asbestos monitoring results as of 10/15/01; ND to 0.037 f/cc; notes on rubble pile results.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.618
Machine-extracted titleNYC-WTC_000388821
Asbestos, lead, heavy metals results by zone; summary of exceedances per PEL.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.618
Machine-extracted titleNYC-WTC_000278783
Summary of OSHA asbestos and related contaminant results across WTC zones.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.617
Machine-extracted titleNYC-WTC_000320840
OSHA sampling results for asbestos, noise, and general occupational exposure on rubble-pile work areas.
Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.617
Machine-extracted titleNYC-WTC_000437382
OSHA sampling overview: asbestos, rubble pile, and noise monitoring results to late Oct 2001.
Parks and Recreation, Dept. of · Box unavailable · assignment probability 0.616
Machine-extracted titleNYC-WTC_000186528
Summary of OSHA air monitoring results for asbestos and dust at the World Trade Center site as of October 15, 2001.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.615
Machine-extracted titleNYC-WTC_000251942
Bechtel/ATC air sampling results for asbestos and lead at World Trade Center site, Oct 2001.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.615
Machine-extracted titleNYC-WTC_000290390
OSHA asbestos and noise sampling results summarized through Nov 5.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.614
Machine-extracted titleNYC-WTC_000268887
OSHA sampling overview and results for asbestos at Stuyvesant High School.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.612
Machine-extracted titleNYC-WTC_000199906
OSHA sampling report detailing asbestos concentration levels in the financial district and rubble pile as of December 2001.
Fire Department · Box unavailable · assignment probability 0.612
Machine-extracted titleNYC-WTC_000361391
OSHA sampling results summary for asbestos across financial district rubble area and personal samples.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.612
Machine-extracted titleNYC-WTC_000341962
531 asbestos samples; rubble-pile focus; 32 of 210 exceedances; 31 personal samples; noted sampling at Pier 25.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.607
Machine-extracted titleNYC-WTC_000360776
OSHA asbestos sampling results with counts and ND/low readings; rubble pile focus.
Design and Construction, Dept. of · Box unavailable · assignment probability 0.607
Machine-extracted titleNYC-WTC_000304160
OSHA air monitoring results for asbestos; most samples below PEL with some rubble-pile exceedances analyzed.
Emergency Management, Office of · Box unavailable · assignment probability 0.606
Machine-extracted titleNYC-WTC_000208440
Summary of OSHA air monitoring results for asbestos in the Financial District and at the rubble pile as of October 16, 2001.
Sanitation, Dept. of · Box unavailable · assignment probability 0.605