NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
Collection → topic

OSHA asbestos and VOC sampling in the financial district

← Whole collection · Parent topic

1384 indexed pages · 557 indexed documents

Records of environmental testing for asbestos and volatile organic compounds conducted by OSHA personnel in Lower Manhattan following the 9/11 attacks.

machine-extracted · confidence 0.95 · Check page ↗

ranging · overexposures · excluding · isocyanates · latent · discriminating · encourage · overwhelming · dramatically · instances · resulting · district

Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.

Sub-topics

No sub-topics indexed.

Documents in this topic

Ordered by assignment probability. A document-level assignment does not establish that every page is about this subject.

OSHA sampling results summary, 02/06/02

Machine-extracted title

NYC-WTC_000280333

Asbestos and rubble-pile exposure results; TEM/PCM analysis reduced fiber counts.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.840

machine-extracted · confidence 0.84 · Check page ↗

OSHA sampling results summary, World Trade Center

Machine-extracted title

NYC-WTC_000322550

OSHA asbestos, lead, arsenic, and diesel particulate exposure results from World Trade Center site.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.839

machine-extracted · confidence 0.84 · Check page ↗

OSHA sampling results, 2/6/02 summary

Machine-extracted title

NYC-WTC_000340060

OSHA asbestos exposure and noise monitoring results through 2/6/02.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.839

machine-extracted · confidence 0.84 · Check page ↗

OSHA sampling results, asbestos, NYC site, Feb 2002

Machine-extracted title

NYC-WTC_000360679

OSHA asbestos air monitoring; disposal of samples and TEM reanalysis near rubble pile; exposure within limits.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.838

machine-extracted · confidence 0.84 · Check page ↗

OSHA sampling results, 2/13/02, NYC

Machine-extracted title

NYC-WTC_000341895

Asbestos and noise results from financial district and rubble pile workers.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.837

machine-extracted · confidence 0.84 · Check page ↗

OSHA sampling results summary, WTC site, 2002

Machine-extracted title

NYC-WTC_000388145

Summary of asbestos and noise sampling results at the WTC financial district rubble site.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.837

machine-extracted · confidence 0.84 · Check page ↗

OSHA sampling results summary, 2002

Machine-extracted title

NYC-WTC_000280216

Summary of asbestos sampling in Financial District and rubble pile; TEM/PCM follow-up.

Citywide Administrative Services, Dept. of · Box unavailable · assignment probability 0.836

machine-extracted · confidence 0.84 · Check page ↗

OSHA sampling summary for WTC site, February 2002

Machine-extracted title

NYC-WTC_000199691

Summary of OSHA air monitoring results for asbestos and other hazards at the World Trade Center site as of late February.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.835

machine-extracted · confidence 0.84 · Check page ↗

OSHA Asbestos and Noise Sampling Summary, Jan 2002

Machine-extracted title

NYC-WTC_000187704

Summary of OSHA sampling results from the financial district and rubble pile showing asbestos levels below exposure limits.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.835

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, WTC site, Feb 2002

Machine-extracted title

NYC-WTC_000289978

Summary of OSHA asbestos and general noise sampling across World Trade Center rubble area through Feb 2002.

Transportation, Dept. of · Box unavailable · assignment probability 0.833

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, Feb 6, 2002

Machine-extracted title

NYC-WTC_000320811

Asbestos sampling totals and rubble pile exposures through Feb 6, 2002; PCM/TEM analyses noted.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.833

machine-extracted · confidence 0.83 · Check page ↗

OSHA Asbestos Air Monitoring Summary, Feb 2002

Machine-extracted title

NYC-WTC_000188000

Summary of OSHA air monitoring results for asbestos and noise at the World Trade Center site as of February 19, 2002.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.833

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, asbestos/noise

Machine-extracted title

NYC-WTC_000290281

Summary of OSHA sampling results for asbestos and noise exposures in WTC area.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.833

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results, Feb 2002 update

Machine-extracted title

NYC-WTC_000317850

Updated OSHA sampling results for asbestos; totals and rubble pile data.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.832

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, Feb 2002

Machine-extracted title

NYC-WTC_000267555

Row of asbestos and noise sampling results after rubble pile work.

Citywide Administrative Services, Dept. of · Box unavailable · assignment probability 0.831

machine-extracted · confidence 0.83 · Check page ↗

OSHA asbestos sampling data, 9/26/2001

Machine-extracted title

NYC-WTC_000388969

Air and TEM/PCM results for area samples at WTC rubble pile on 9/26/01; asbestos fibers quantified.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.831

machine-extracted · confidence 0.83 · Check page ↗

OSHA asbestos sampling results summary, Feb 2002

Machine-extracted title

NYC-WTC_000337309

OSHA sampling results summary for asbestos, total samples and counts in Financial District and rubble pile.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.830

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, Feb 19, 2002

Machine-extracted title

NYC-WTC_000388963

OSHA asbestos and noise sampling results at WTC site; fibers below PEL after TEM analysis, Feb 2002.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.830

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, asbestos

Machine-extracted title

NYC-WTC_000385703

OSHA sampling results summary for asbestos; overview of sample counts and results.

Chief Medical Examiner, Office of · Box unavailable · assignment probability 0.830

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, Feb 2002

Machine-extracted title

NYC-WTC_000289993

OSHA asbestos and noise sampling update through Feb 25, 2002; focus on rubble pile exposures.

Transportation, Dept. of · Box unavailable · assignment probability 0.830

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, Feb 13, 2002

Machine-extracted title

NYC-WTC_000388966

OSHA asbestos sampling results at WTC site; high exposure areas identified but overall levels low.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.829

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results, asbestos, NYC site, Feb 2002

Machine-extracted title

NYC-WTC_000360682

Asbestos and noise monitoring; many samples below PEL; some exceedances reviewed by TEM methods.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.829

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, Feb 19, 2002

Machine-extracted title

NYC-WTC_000205242

Summary of OSHA air monitoring results for asbestos and worker exposure as of February 19, 2002.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.829

machine-extracted · confidence 0.83 · Check page ↗

NIOSH air sampling results summary

Machine-extracted title

NYC-WTC_000266618

Summary of OSHA/NIOSH asbestos sampling across financial district and debris area.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.828

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results, Feb 2002 update

Machine-extracted title

NYC-WTC_000266814

OSHA asbestos and personal exposure sampling results with follow-up interpretation.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.828

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, asbestos, 2/19/02

Machine-extracted title

NYC-WTC_000279934

Summary of OSHA asbestos air monitoring results for the World Trade Center site through 2/19/02.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.828

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling summary, 2/25/02

Machine-extracted title

NYC-WTC_000339828

OSHA sampling results: asbestos and noise data for rubble pile workers as of 2/25/02.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.827

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results, 2/19/02, NYC (2 of 2)

Machine-extracted title

NYC-WTC_000341892

Asbestos and noise monitoring results in rubble/debris areas and surrounding sites.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.827

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling summary, Feb 2002

Machine-extracted title

NYC-WTC_000388599

OSHA sampling results summary for asbestos, noise, and rubble-pile exposures around WTC site.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.827

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results, asbestos, NYC site, Feb 2002

Machine-extracted title

NYC-WTC_000360676

OSHA asbestos and personal exposure results; evaluation before and after rubble pile sampling in financial district.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.826

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, May 15, 2002

Machine-extracted title

NYC-WTC_000320831

OSHA asbestos sampling through May 15, 2002; high counts with TEM validation noted.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.826

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, WTC site, Feb 2002

Machine-extracted title

NYC-WTC_000209253

Summary of OSHA air monitoring data as of February 20, 2002, covering asbestos, noise, and other exposures at the World Trade Center rubble pile and financial district.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.826

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results summary, Feb 2002

Machine-extracted title

NYC-WTC_000407409

Overview of asbestos and noise monitoring results at the WTC site.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.826

machine-extracted · confidence 0.83 · Check page ↗

OSHA sampling results, 2/19/02, NYC

Machine-extracted title

NYC-WTC_000341889

Asbestos and noise exposure summary for financial district and rubble workers.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.824

machine-extracted · confidence 0.82 · Check page ↗

OSHA sampling results summary, Apr 9, 2002

Machine-extracted title

NYC-WTC_000320822

OSHA asbestos sampling through Apr 9, 2002; debris field and rubble pile exposure data.

Health and Mental Hygiene, Dept. of · Box unavailable · assignment probability 0.824

machine-extracted · confidence 0.82 · Check page ↗

OSHA sampling results summary, WTC site, Feb 2002

Machine-extracted title

NYC-WTC_000289982

Overview of asbestos and noise sampling at WTC rubble area; results indicate concentrations mostly below OSHA limits.

Transportation, Dept. of · Box unavailable · assignment probability 0.824

machine-extracted · confidence 0.82 · Check page ↗

OSHA sampling summary, asbestos and noise, Feb 2002

Machine-extracted title

NYC-WTC_000205201

Summary of OSHA air monitoring results for asbestos, diesel exhaust, and noise exposure at the World Trade Center site as of February 4, 2002.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.823

machine-extracted · confidence 0.82 · Check page ↗

Laboratory report, asbestos results, Feb 2002

Machine-extracted title

NYC-WTC_000357908

OSHA sampling results summary for asbestos at WTC site, including ND to 0.037 f/cc ranges.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.823

machine-extracted · confidence 0.82 · Check page ↗

OSHA sampling summary, asbestos and noise, Feb 2002

Machine-extracted title

NYC-WTC_000205198

Summary of OSHA air monitoring results for asbestos, diesel exhaust, and noise exposure at the World Trade Center site as of February 11, 2002.

Design and Construction, Dept. of · Box unavailable · assignment probability 0.823

machine-extracted · confidence 0.82 · Check page ↗