Letter regarding asbestos sampling at 106 Fulton Street, Feb 2002 — page 6
Summary Consultant letter confirming visual review and bulk sample collection of dust at 106 Fulton Street.
Asbestos Present
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary Consultant letter confirming visual review and bulk sample collection of dust at 106 Fulton Street.
Asbestos Present
Summary Fragmented record associated with the 80 West Street and Financial Center folder in DEP Box 53.
Asbestos Structures Detected Revieved By.
Summary Invoice from Fiber Control Inc dated August 8, 2002 for exterior area cleanup at 94 Reade Street.
Total amount of asbestos-containing material to be abated during,this work `° %~t!
Summary City receiving report acknowledging delivery of HVAC consulting services for WTC from TAMS Consultants Inc.
from cleaning operations will be handled as asbestos as a precaution.
PROJECT NOTIFICATION - (ASBESTOS INSPECTION REPORT) 1.
Summary Asbestos inspection report form and project notification to NYC Department of Environmental Protection requiring original and three copies.
ASBESTOS ABATEMENT CONTRACTOR 12.
Summary Fax cover sheet from RH Consultants and Associates sent to DEP on May 10, 2002 regarding environmental matters.
Investigator, State Cart- ifioata P11 y City of New York Certificate P11 conducted an investigation for Asbestos containing
Summary Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
NYC 9/11 Public Portal Document STONVISIONOYOABET NEEALTHOR License and Certificate Unit BUILDING 12, STATE CAMPUS ALBANY, NY 12240 * ASBESTOS- LCENSE TE OF NEW LICENSE NUMBER: DATE OF ISSUE: RATION DATE: iPI AprIL 21, 2004
Summary Cover page for an air monitoring and bulk sampling report for Building #200 at 375 South End Avenue.
Blake a NY State Asbestos Inspector (AH#00-08397) and Americo Rodriguez Jr., a NY State Asbestos Inspector (AH#89-07160).
Summary Page displaying a document identification number and reference code for records associated with 200 Liberty Street.
Lead Lead mg/gappm Hercury 000 000 000 NYC 9/11 Public Portal Document CA = Chrysotile Asbestos NVA = No Visible Asbestos NAD/INA = No Asbestos Detected/ FAT = Final Air Test DC= During Clearing IWA = Inside Work Area AO
Summary Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
.w»MS O,, Asbestos Abatement Environmental Cleanup
Summary Letter from DEP Bureau of Engineering regarding an asbestos inspection at the Department of Sanitation office building.
(TEM) Results for Asbestos (ASTM 5755 Dust) 001-56-200; NYC DOS; 44 Beaver Street - 8th Floor - Manhattan Surface « Analytical Stuctre 8—s& Annalytical Structure Area Asbestos Sensitivity Density Sensitivity Density Scil.ab
NYC 9/11 Public Portal Document ASBESTOS ANALYTICAL REPORT ASBESTOS CONTROL PROGRAM LABORATORY 96.05 HORACE HARDING EXPRESSWAY
Summary Purchase order form from JLC Environmental Consultants dated March 19, 2003 for environmental testing services.
I hope future PAH analyses can use the appropriate reporting limit as it will result in data that can be compared to the health-based benchmark. 2) The asbestos data indicates that the reporting
Summary Transmittal letter from ETS Contracting to DEP submitting close-out documentation for 114 Liberty Street dated April 21, 2003.
DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND OR PREVIOUSLY L NONFRIABLE ASBESTOS MATERIAL BECOMES CRUMPLED, PULVERIZED OR REDUCED TO POWDER: ACM HAS BEEN IDENTIFIED
Samples reported as ct % or none PLM has been i nown to miss asbestos in a small percentage of aamplee which contain asbestos.
Summary Letter reporting asbestos testing results for air and dust at Borough of Manhattan Community College in February 2002.
Table 2 Asbestos in Dust SamnlinR Sample No.
Summary Memo inviting contractors to bid on a cleaning contract at 125 Liberty Street following the WTC collapse.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
This sawpling must be un4ertaksn immediately becanee asbestos fibers in* ventilation systems are likely to deposit throughout the building.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Not surprisingly, asbestos became the priority substance to test for at 105 Duane.