DEP Hard Copies (68 Boxes) / DEP Box 42 / WTC- Air Data
NYC-WTC_000161642Machine-extracted title FormSummary Agenda listing panelists from federal agencies, unions, and city departments for a March 2004 conference on post-9/11 air quality.
showed the presence of asbestos above the 1 percent benchmark.
DEP Hard Copies (68 Boxes) / DEP Box 10 / BACKGROUND STUDY DATA 11.13
NYC-WTC_000149899Machine-extracted title Lab reportSummary Proposal for sampling and assessing building interiors in the vicinity of the World Trade Center site.
Asbestos
Asbestos air samples will be collected and analyzed by TEM analysis. Five samples collected
simultaneously at each location with a minimum volume of 1200 liters.
DEP Hard Copies (68 Boxes) / DEP Box 10 / BACKGROUND STUDY DATA 11.13
NYC-WTC_000149920Machine-extracted title Lab reportSummary Proposal for sampling and assessing building interiors in the vicinity of the World Trade Center site.
Asbestos
Asbestos air samples will be collected and analyzed by TEM analysis. Five samples collected
simultaneously at each location with a minimum volume of 1200 liters.
DEP Hard Copies (68 Boxes) / DEP Box 44
NYC-WTC_000164875Machine-extracted title Lab reportSummary Proposal to sample and assess building interiors near the World Trade Center for seven preliminary contaminants.
Asbestos
Asbestos air samples will be collected and analyzed by TEM analysis. Five samples collected
simultaneously at each location with a minimum volume of 1200 liters.
DEP Hard Copies (68 Boxes) / DEP Box 10 / ASBESTOS
NYC-WTC_000149460Machine-extracted title Permit applicationSummary DEP asbestos project notification form and inspection report dated December 12, 2002.
Asbestos
Asbestos air samples will be collected and analyzed by TEM analysis. Five samples collected
simultaneously at each k cation with a minimum volume of 1200 liters.
DEP Hard Copies (68 Boxes) / DEP Box 10 / ASBESTOS
NYC-WTC_000149507Machine-extracted title Permit applicationSummary DEP asbestos project notification form and inspection report dated December 12, 2002.
Asbestos
Asbestos air samples will be collected and analyzed by TEM analysis. Five samples collected
simultaneously at each location with a minimum volume of 1200 liters.
DEP Hard Copies (68 Boxes) / DEP Box 05 / EPA WEB
NYC-WTC_000140996Machine-extracted title UnclassifiedSummary Press release announcing joint EPA and OSHA environmental monitoring data collection at the World Trade Center site.
asbestos-containing material.
DEP Hard Copies (68 Boxes) / DEP Box 11 / WTC DC TO RC LETTERS CALLEHAN WHITMAN ETC. WARD DOCTOROFF KENNY
NYC-WTC_000151369Machine-extracted title Lab reportSummary A letter defending the validity of DEP and contractor data used to clear residential units at 114 Liberty Street for re-occupancy.
Asbestos - Eighty-eight air samples were collected before and/or during cleaning events.
DEP Hard Copies (68 Boxes) / DEP Box 08 / NO INFO
NYC-WTC_000145691Machine-extracted title UnclassifiedSummary EPA report excerpt discussing the cessation of outdoor air monitoring in June 2002 and ongoing concerns about indoor contamination.
^eS**^* Tests of indoor asbestos contamination have shown that the distribution of
asbestos within indoor spaces is not consistent.
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 2 OF 2
NYC-WTC_000155622 Chain of custodyMonitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 2 OF 2
NYC-WTC_000155629 Chain of custodyMonitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 43 / E-mails 2003 M. Gilsenan
NYC-WTC_000162816Machine-extracted title Chain of custodySummary Request for review of monitoring contractor specifications for air sampling, including sampling methodologies, limits of detection, and clearance criteria, with reference to prior…
Monitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 43 / E-mails 2003 M. Gilsenan
NYC-WTC_000162842Machine-extracted title Chain of custodySummary Correspondence regarding Schedule A forms and a draft scope of work for cleaning and air monitoring contracts at the site.
Monitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 43 / E-mails 2003 M. Gilsenan
NYC-WTC_000162854 Chain of custodyMonitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 43 / E-mails 2003 M. Gilsenan
NYC-WTC_000162865 Chain of custodyMonitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 42
NYC-WTC_000160436Machine-extracted title Memo or letterSummary Official correspondence confirming receipt of analytical test results for a residential building and outlining the joint cleanup program.
Included in the letter was
reaffirmation of Asbestos Control Program staffs observations whereby pre-existing
building materials were identified as having suspect asbestos-containing material (
DEP Hard Copies (68 Boxes) / DEP Box 42
NYC-WTC_000160438Machine-extracted title Memo or letterSummary Official correspondence confirming receipt of analytical test results for a residential building and outlining the joint cleanup program.
Included in the letter was
reaffirmation of Asbestos Control Program staffs observations whereby pre-existing
building materials were identified as having suspect asbestos-containing material (
DEP Hard Copies (68 Boxes) / DEP Box 43 / E-mails 2003 M. Gilsenan
NYC-WTC_000162872 Chain of custodyMonitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 43 / E-mails 2003 M. Gilsenan
NYC-WTC_000162892 Chain of custodyMonitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 2 OF 2
NYC-WTC_000155411 Chain of custodyMonitors must
have served as a third party project monitor on at least 25 asbestos abatement projects.