2003 E-Mails Sent M Gilsenan — page 4
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
, dioxin, lead, mercury, etc, but we only tested for asbestos).
Summary Excerpt from a scientific report comparing air quality data from Ground Zero to other pollution events.
s May announcement with the asbestos cleanup and testing “ asbestos cleanup program was
Summary Laboratory analytical report documenting dust characterization and environmental contamination assessment results from facility testing.
NYC 9/11 Public Portal Document Exhibit B: Results from Asbestos, Mercury, and other Heavy Metals Testing NYC-WTC_000154870
Summary Draft news story summarizing EPA findings that most Lower Manhattan apartments tested had minimal asbestos contamination.
The clearance level set by the EPA for asbestos is 0.0009 fibers per cubic centimeter.
Summary Proposed news story reporting that most tested apartments showed asbestos levels below the EPA clearance limit.
The clearance level set by the EPA for asbestos is 0.0009 fibers per cubic centimeter.
Summary Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Internal memo instructing staff to ensure accurate public messaging regarding specialized cleaning requirements for asbestos and toxins.
" _ for asbestos at the residents’ request /"The agency -says ordinary h^e
Summary Fragmented document page likely associated with World Trade Center environmental monitoring records from late 2001.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during
Summary Notice of a mandatory pre-bid meeting and scope for asbestos abatement at 125 Cedar Street in August 2002.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Mandatory pre-bid meeting notice for asbestos abatement and cleaning at 125 Cedar Street scheduled for August 28, 2002.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Summary Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Summary Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Summary Document outlining mandatory pre-bid meeting and scope for asbestos abatement contractor work at a WTC building.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.
Summary Document outlining mandatory pre-bid meeting and scope for asbestos abatement contractor work at a WTC building.
All asbestos air samples collected during clean-up activities shall be analyzed via TEM.