114 LIBERTY 2 OF 2 — page 10
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Asbestos Air Monitoring 1, Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Formal letter criticizing the EPA and DEP for alleged failures in cleaning asbestos and silica from 114 Liberty Street.
Asbestos - Eighty-eight air samples were collected before and/or during cleaning events.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Page 3, Asbestos Air Sample Collection and Analysis, Number 2 - Asbestos air samples shall be analyzed in accordance with EPA 40 CRF Part 763 Final Rule (AHERA) using a transmission electron microscope (TEM) and reported
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this
Summary Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Notice instructing that original WTC documents must be preserved as evidence and not disposed of.
Therefore, this space within the building is not considered to have met the primary clearance value for asbestos.
Summary Letter from EPA official to a Congressional representative criticizing the adequacy of the 114 Liberty Street cleanup.
found by the residents at 114 Liberty St. represents a health risk, although of uncertain exact numerical magnitude, as it demonstrates that asbestos is above background levels.
Summary Congressional press release citing evidence of persistent WTC dust contamination at 114 Liberty Street.
@ 0.0018 s/cc Asbestos/Fibrous Glass - PCM 3 samples were below the health-based benchmark of 0.01 f/cc and 2 samples were overloaded and could not be analyzed.