90 FULTON STREET 1001191, 77/23 BN# 1001191 — page 1
ASBESTOS AS888TOS CO?1C. CONC.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
ASBESTOS AS888TOS CO?1C. CONC.
Summary Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
NYC 9/11 Public Portal Document • elevated levels of five COPCs designated by the United States Environmental Protection Agency (USEPA) as being associated with the WTC dust (asbestos
Summary Document page displaying raw analytical data or charts related to asbestos testing for 92 Fulton Street.
contractor with NYCDEP and NYSDOL asbestos certified workers.
Summary Invoice from Asbestos Removal Corp detailing costs for roof cleanup at 67 Greenwich Street dated June 13, 2002.
NY Asbestos Fiber Analysis by Transmission Electron Microscopy (TEM) Performed
Summary Formal agreement between the City and a landowner regarding the removal of foreign material from building exteriors at 94 Greenwich Street.
contractor with NYCDEP and NYSDOL asbestos certified workers.
Summary Asbestos inspection form documenting visual assessment and sampling details for 120 Fulton Street in June 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No.
Summary Invoice for debris removal services at 120 Fulton Street issued by Kurzban & Son Control, Inc. to the DEP in 2002.
11 OZ Asbestos work schedule ❑ Monday ❑ Tuesday ❑ vy may 0 Thursday 0 Friday Q Saturday
Summary Page with illegible text and no visible content to identify as a manifest.
PAGE 1 OF I ENVIRONMENTAL DIVISION DATE: 7/30/02 ASBESTOS LABORATORY TEM AIR SUMMARY SHEET CLIENT: Warren &
Summary Fax cover sheet with illegible content and no visible sender or recipient details.
PAGE 1 OF 1 ENVIRONMENTAL DIVISION DATE: 7/30/02 ASBESTOS LABORATORY TEM AIR SUMMARY SHEET cu r: Warren
Summary Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.
NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. 9A FUTON STREET Inspector Dennis Antzoulatos Inspection Date: AS NOTED Page 2of z SIDEWANK COSURE BAPRIERS DURING THE CLAN UP PROCEDURES T GAIN ACCESS
Summary Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
approved subcategories andlor.analytes are listed below: Miscellaneous Asbestos in Friable Material EPA 600/M4182/020 • rial No.: 25342 raperty of the New York State Department
Summary Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
ENVIRONMENTAL ANALYSES SOLID AND HAZARDOUS WASTE All approved subcategories• and/or.analytes are listed. below: - - Miscellaneous Asbestos
Summary Agreement between the City of New York and a landowner regarding WTC debris cleanup at 143 Fulton Street.
the name of the $ 25,000 claim maximum deductible, except as .contractor, and each subcontractor, performing any approvedby the CONTRACT MANAGEMENT OFFICE operations involving the removal of asbestos
Summary Chain of custody document tracking the collection and transport of bulk samples from 67 Greenwich Street for asbestos analysis.
OUR- I CA ASBESTOS CONTROL PROGRAM BULK ANALYSIS CHAIN OF CUSTODY incident No.:______________________
Summary Document excerpt summarizing bond requirements, liquidated damages, and performance periods for a 94 Greenwich Street contract.
name of the $' 25,000 claim.maximum deductible, except as contractor, and each subcontractor, performing any approved by the CONTRACT MANAGEMENT OFFICE operations involving the removal of asbestos
Summary Document page displaying raw analytical data or charts related to asbestos testing for 92 Fulton Street.
omF ca operations InvO Ing the removal of asbestos materials.
Summary March 2002 call log entry regarding a WTC-related issue at 106 Greenwich Street.
THIS COMPLAINT WAS FORWARDED TO THE ASBESTOS UNIT FOR APPROPRIATE ACTION.
Summary Department of Transportation permit for pavement work valid from October to November 2002.
ISSUE DATE 10/11/2002 TOTAL FEE $****50.00 FEE WAIVED PERMISSION HEREBY GRANTED TO : NAME : TRIO ASBESTOS
Summary Inspection report documenting debris and asbestos conditions on the first floor of 106 Greenwich Street during a September 2002 survey.
NYC 9/11 Public Portal Document PAGE 1 OF ASBESTOS INSPECTION REPORT PREMISE NO. 106 FLOOR 1st.#4 ZIP 10006 CONTRACTORS NAME elsapte STREET GreenwIcH BORO CODE BLOCK 53 STREET SQUAD # BLOGBTYPE 3k BASIS OF INSPECT 4 22357
Summary Inspection log recording decontamination unit construction and roof cleanup activities at 111 Fulton Street from July 14 to 16, 2002.
NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No.