The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Chain of custody form dated August 22, 2002, documenting transfer of samples or materials between DEP personnel.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
Summary Technical review of mold and bacteria laboratory results and draft assessment for 114 Liberty with recommendations for letter revision.
Included in the letter was reaffirmation of DEP's Asbestos Control Program's staff observations whereby pre-existing building materials were identified as having suspect asbestos-containing material (ACM).
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
Summary Invoice from JLC Environmental Consultants for air monitoring services at 114 Liberty Street in March 2003.
Background Asbestos Air Sample Results b. During Asbestos Air Sample Results c.
Summary Document referencing a status update or report regarding the 114 Liberty Street site as of July 2003.
Included in the letter was reaffirmation of Asbestos Control Program staffs observations whereby pre-existing building materials were identified as having suspect asbestos-containing material
Summary Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary EPA confirms that primary and secondary clearance levels for contaminants at 114 Liberty Street have been met.
Asbestos - Eighty-eight air samples were collected before and/or during cleaning events.
Summary EPA correspondence transmitting draft letter to FEMA regarding 114 Liberty with attached documentation and data receipt timeline.
Included in the letter was reaffirmation of DEP’s Asbestos Control Program’s staff observations whereby pre-existing building materials were identified as having suspect asbestos-containing material
Summary A Department of Environmental Protection letter dated April 24, 2003, confirming the completion of clean-up activities and clearance levels at 114 Liberty Street.
a Asbestos — Eighty-eight air samples were collected before and/or during cleaning events.
Summary EPA letter confirming that primary and secondary clearance levels for asbestos and other contaminants were met at 114 Liberty Street.
Asbestos — Eighty-eight air samples were collected before and/or during cleaning events.
Summary EPA confirms that primary and secondary clearance levels for contaminants at 114 Liberty Street have been met.
Asbestos - Eighty-eight air samples were collected before and/or during cleaning events.
Summary Laboratory analysis results for asbestos content in beige bulk samples collected from a pizzeria on one of the building floors.
a Asbestos — Eighty-eight air samples were collected before and/or during cleaning events.
Summary Laboratory analysis results for asbestos content in beige bulk samples collected from a pizzeria on one of the building floors.
a Asbestos — Eighty-eight air samples were collected before and/or during cleaning events.
Summary EPA Region II letter confirming that primary and secondary clearance levels for asbestos and other contaminants were met at 114 Liberty Street.