E-mails M. Gilsenan — page 2
The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
asbestos-containing material (ACM).
Summary Federal agencies respond to resident concerns regarding the validity of environmental clearance data for 114 Liberty Street.
asbestos-containing material (ACM).
Summary Federal agencies respond to resident concerns regarding the validity of environmental clearance data for 114 Liberty Street.
asbestos-containing material (ACM).
Summary A letter defending the validity of DEP and contractor data used to clear residential units at 114 Liberty Street for re-occupancy.
asbestos-containing material (ACM).
Summary Correspondence regarding corrections to FEMA documentation, focusing on proper indoor and outdoor wipe sampling procedures for environmental testing.
asbestos-containing material (ACM).
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
Summary Chain of custody form dated August 22, 2002, documenting transfer of samples or materials between DEP personnel.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
Summary Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Technical review of mold and bacteria laboratory results and draft assessment for 114 Liberty with recommendations for letter revision.
Included in the letter was reaffirmation of DEP's Asbestos Control Program's staff observations whereby pre-existing building materials were identified as having suspect asbestos-containing material (ACM).
Summary DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
Summary Invoice from JLC Environmental Consultants for air monitoring services at 114 Liberty Street in March 2003.
Background Asbestos Air Sample Results b. During Asbestos Air Sample Results c.
Summary Document referencing a status update or report regarding the 114 Liberty Street site as of July 2003.
Included in the letter was reaffirmation of Asbestos Control Program staffs observations whereby pre-existing building materials were identified as having suspect asbestos-containing material
Summary Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project
Summary Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control
The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.
Summary Application for a permit to conduct interior cleaning by a licensed asbestos contractor at 114 Liberty Street.
The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.