Contractors · role on the source record
Tully Construction Co. ← Change entity 1996-02-13 – 2012-12-16
Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
Overview
Distinct page counts by extracted month, not measurements. Source pages by extracted month Month Pages Jan 2002 1 Apr 2002 1
Documents with the most pages Also read as Alternate spellings machine-read from the scans, folded into this one canonical entity.
Tully Constniction Co. · 1× Tully CoNSTRullbiON Co. · 1× Tully Construction, Co. · 1× Tully Construction Company · 1×
Documents grouped by role DEP menu form for 20 Dey Street, Dec 2006 · page 6 NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Environmental Protection, Dept. of · Box DEP Box 51
Illegible form or record, date and subject unclear · page 15 NYC-WTC_000141870
Form document with significant degradation or scanning quality issues making content indecipherable.
Environmental Protection, Dept. of · Box DEP Box 06
Illegible document fragment with reference number · page 14 NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Environmental Protection, Dept. of · Box DEP Box 06
DDC active construction status report, Bronx, undated · page 7 NYC-WTC_000159690
Department of Design and Construction report detailing the status of active infrastructure projects in the Bronx borough.
Environmental Protection, Dept. of · Box DEP Box 41
Design and Construction department header page · page 8 NYC-WTC_000159707
Header page from the Design and Construction department containing standard formatting codes.
Environmental Protection, Dept. of · Box DEP Box 41
Project correspondence log, Stuyvesant Cove, May 2001 · page 1 NYC-WTC_000182266
Correspondence log from the Department of Transportation regarding electrical and signage issues at Stuyvesant Cove.
Transportation, Dept. of · Box not recorded
Journals/Transcripts for DDC memo, Jan 2003 · page 1 NYC-WTC_000269289
Internal memo regarding transmission timing and system check notes.
Design and Construction, Dept. of · Box not recorded
Demolition bid invitation, WTC site · page 1 NYC-WTC_000386595
Bid invitation for demolition of WTC project component; scope and deadlines included.
Design and Construction, Dept. of · Box not recorded
Daily News debris monitoring oversight · page 1 NYC-WTC_000412062
City assigns independent monitors to oversee Ground Zero debris removal.
Unknown Agency · Box not recorded