NYC-WTC_000305550
Ground/Water Treatment invoice for air monitoring services at World Trade, Dec 16, 2001–Jan 6, 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗1993-10-04 – 2006-07-12
machine-extracted · confidence unavailable · Check page ↗Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
| Month | Pages |
|---|---|
| Oct 2003 | 1 |
Alternate spellings machine-read from the scans, folded into this one canonical entity.
NYC-WTC_000305550
Ground/Water Treatment invoice for air monitoring services at World Trade, Dec 16, 2001–Jan 6, 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000305703
Design overview for MTBE removal in groundwater treatment at World Trade Center.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000305705
Description of MTBE treatment system components and function at WTC site.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000305996
Invoice for air monitoring services at World Trade Center, Mar 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000306036
Invoice for air monitoring services at the World Trade Center in Dec 2001, with periods Dec 16–Jan 6, 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000306069
Air monitoring services invoice for November 2001 at World Trade Center site.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000306070
Air monitoring services invoice for December 2001 at World Trade Center site.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000306071
Air monitoring services invoice for Dec 2001 period at World Trade Center site.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000322287
Invoice for air monitoring services at World Trade Center, Dec 2001.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000322512
DEP-PA-NY/NJ questions about sampling regimes and detection limits for PCBs and solvents.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000322750
G&W Technology report describing treatment system for MTBE in World Trade Center water.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000322797
Invoice for air monitoring services at World Trade Center (Dec 2001–Jan 2002).
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000330549
STL Edison notes on PCB analysis using EPA Method 608 and MDL considerations.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000330562
DEP permit amendment questions about PCB/CHLORO methods and detection limits.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000330731
Ground/Water Treatment & Technology invoice for air monitoring Dec 16, 2001–Jan 6, 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000331161
DEP memo concerning WTC/Path tunnel recovery activities and case file C-3192.
Environmental Protection, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000339656
Design of groundwater treatment system for MTBE removal; discharge to sewer; site name World Trade Center.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000341572
MSG: PCB analysis requested by EPA Method 608 with MDL 0.065 ppb; notes on analysis scope.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000341573
DEP memo discussing permit amendment sampling for chlorodifluoromethane and PCB analyses using EPA Method 608.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000341575
Response to fax requesting additional analyses for WTC water discharges.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000342159
Letter enclosing water analysis correspondence for WTC recovery project.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000342331
Invoice for air monitoring and discharge sampling at World Trade Center paving project.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000342459
Invoice for air monitoring services at World Trade Center site, Dec 2001–Jan 2002 period.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000349045
Chain-of-custody file for environmental samples, including GC/MS data summaries.
Environmental Protection, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000349045
Chain-of-custody file for environmental samples, including GC/MS data summaries.
Environmental Protection, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000349045
Chain-of-custody file for environmental samples, including GC/MS data summaries.
Environmental Protection, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000349144
Volatile organics results summary and LC/MS data for WTC samples.
Environmental Protection, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000349144
Volatile organics results summary and LC/MS data for WTC samples.
Environmental Protection, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000349144
Volatile organics results summary and LC/MS data for WTC samples.
Environmental Protection, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000357274
DEP file discussion on sampling and permit amendment for WTC recovery work.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000357277
STL Edison notes on PCB analysis MDL and method details for WTC samples.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000361554
Invoice for air monitoring services at the World Trade Center during November 2001.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000361555
Invoice for air monitoring services at the World Trade Center during December 2001.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000386410
Invoice for air monitoring and discharge sampling services during WTC-related work, March–April 2002.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000387342
March 11, 2002 memo about sampling for permit C-3192 and PCB analysis.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000387344
STL Edison reply detailing EPA Method 608 PCB analyses and MDLs.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000387347
DEP correspondence on permit C-3192 and sampling protocols for WTC PATH recovery.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000387349
PCB analysis MDLs and methodology for EPA Method 608 in WTC project.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000388768
World Trade Center MTBE groundwater treatment project; design details and discharge notes.
Design and Construction, Dept. of · Box not recorded
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this entity's source pages are filed under, largest first. Folder labels are omitted to avoid surfacing personal names.
Design and Construction, Dept. of · Box unavailable · Folder 1 Volume NYC-WTC0009 · 71 source pages
Design and Construction, Dept. of · Box unavailable · Folder 2 Volume NYC-WTC0008 · 9 source pages
Environmental Protection, Dept. of · Box unavailable · Folder 3 Volume NYC-WTC0009 · 7 source pages
Environmental Protection, Dept. of · Box DEP Box 51 · Folder 4 Volume NYC-WTC0004 · 1 source page
Environmental Protection, Dept. of · Box unavailable · Folder 5 Volume NYC-WTC0008 · 1 source page