NYC-WTC_000172542
Report from Ambassador Construction Co. detailing a generator load test conducted on July 31, 1999, and noting minor issues with the differential pressure controller.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗