NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

IBM Class 9 urgent memo, DoITT

Machine-extracted title · confidence 31%

Internal memo draft about IBM Class 9 project hours and scheduling.

NYC-WTC_000458039–000458040
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Additionally, it would indicate by the level of work being performed, which individuals or roles would have been instrumental in performing that work.

As part of the IBM deliverables, any other reports that you would deem helpful in pinpointing the timing of specific services performed would be greatly appreciated.

Such as: Weekly Project Status Reports Completed Site Survey Report Engineering Document Test Logs Job Completion Notice Installation Checklist Admin Hours Expended for non-technical duties

....... reports that evidence who performed the finalization of system deployments and when, would only further clarify the chain of events that occurred.

Another useful point of clarification would be record of any custom ordered components that went into the build of the projects. When queried about the cost of the components that went into certain configurations, we were unable to identify the list price for certain items. An example was an item called: "J68974D1 LI DUAL LW TERM BAY TWO SYSTEM" which was part of the FT-2000 Node 1 and was priced by the vendor at $76,688.00. Can you identify special custom-built components of the equipment list?

Our efforts to gather this information is an attempt to complete the documentary backup required prior to paying IBM. At the same time, we are viewing this from the perspective of a pre-audit requirement. Possessing this support data will be crucial to DoITT and allow us to withstand the rigors of a fully anticipated inspection, as a result of the FEMA claims submitted to get reimbursement for this and other restoration type work.

Your assistance would be most appreciated. If you have any additional questions, please contact Loyston or myself.

Thank you.

Nancy Cruz DoITT Tel: 718-403-8218 Fax: 718-403-8504 E-mail: [email protected]

CITY_21MC100_011384491

NYC-WTC_000458040

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000458040Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000277493

Record discusses validation of IBM labor/services for Class 9 project at 75 Park Place/59 [redacted] Node, with hours and timelines.

Similar indexed content

Compare copies and versions →