NYC-WTC_000454913
April 2000 memo outlining missing certifications for bulk sampling contractors.
5 shared non-person entities · 1 shared topics · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗Special experience and licensing requirements for contractors performing bulk sampling.
NYC-WTC_000454848
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SPECIAL EXPERIENCE AND LICENSING REQUIREMENTS FOR CONTRACTORS PROVIDING BULK SAMPLING AND ANALYSIS IN CONJUNCTION WITH ASBESTOS AND LEAD ABATEMENT PROJECTS WITHIN THE FIVE BOROUGHS OF THE CITY OF NEW YORK
The bidder must include, with his/her bid, copies of the following qualifications. Failure to provide these documents at the time of bid opening will result in disqualification of the bid as non-responsive.
The successful bidder, whether an individual, corporation, partnership, joint venture or other legal entity, must demonstrate that it has been licensed by NYS - Department of Labor as an Asbestos Contractor for each of the three years prior to the date of the bid opening.
The successful bidder must also demonstrate: 1. That during the three year period prior to the bid date it has been in business, in the same legal form in which it submits its bid and has provided bulk sampling for asbestos and lead hazards as a routine part of its daily operations. 2. That during the three year period prior to the bid opening, it has provided bulk sampling services in the same legal form in which it submits its bid, in connection with asbestos and lead abatement projects with an aggregate sampling cost of $1,000,000 in each of the three years. Names and telephone numbers of persons who will verify this experience must be included. 3. That it participates in and is accredited by NIST NVLAP for Asbestos Bulk Fiber analysis for the last three years. 4. That it is accredited by NYS State Department of Health Environmental Laboratory Accreditation Program for Environmental Analysis of Solid and Hazardous Wastes, for Asbestos in Friable Material, for Lead in Paint, and for Lead in Dust Wipes for the last three years.. 5. That it services and calibrates the optical instruments every six months throughout the duration of the contract and furnishes an affidavit stating such. 6. That it participates in and has a current rating as “proficient” in the AIHA Bulk Sample PAT Program and in the ELPAT Program in ten (10) of twelve (12) of the most recent rounds of proficiency testing. 7. Furnishes a listing of the individual microscopist who have successfully completed on advanced course in microscopial identification of asbestos materials.
NB. The laboratory selected by the Vendor to conduct TEM analyses, must be accredited by the NYS - Department of Health and by NVLAP for the appropriate type of analysis as described in this contract.
The bidder shall submit the names and resumes of at least three (3) employees of the bidder who will perform as Environmental Technicians along with copies of the valid NYS/NYC certificates for Asbestos Inspector/Investigator and copies of the training Certificates for Lead Inspector (24 hour course) from EPA/HUD accredited training entity.
The bidder shall submit the names, resumes and training certificates of the individual microscopists who will perform the laboratory analyses for this contract.
Failure to meet the above described experience requirements will result in a determination of non responsiveness of the bid. Compliance with these experience requirements will be determined solely by the City. -3a-
CITY_21MC100_002794984
NYC-WTC_000454848
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000454913
April 2000 memo outlining missing certifications for bulk sampling contractors.
5 shared non-person entities · 1 shared topics · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234840
Contract document outlining the purpose to implement indoor dust sampling for seven contaminants including asbestos and lead in 14 buildings not affected by Ground Zero.
5 shared non-person entities · 1 shared topics · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234799
Chain of custody form and contract statement for indoor dust sampling to analyze contaminants including asbestos and lead in selected buildings.
5 shared non-person entities · 1 shared topics · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178137
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
4 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000199865
Contract establishing procedures for collecting settled and airborne dust samples to analyze contaminants like asbestos, lead, and dioxins in selected buildings.
5 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178128
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
5 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162898
Correspondence sharing monitoring specifications and related documents for the 114 Liberty Street site cleanup project.
5 shared non-person entities · 1 shared topics · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155422
Distribution of updated monitoring specifications and related documents for the 114 Liberty Street project.
5 shared non-person entities · 1 shared topics · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000206797
Contract scope detailing mandatory pre-bid meeting and requirements for licensed contractors to clean and monitor asbestos at 114 Liberty Street.
5 shared non-person entities · 1 shared topics · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279035
Background on cleaning scope and on-site monitoring for asbestos abatement at 114 Liberty.
5 shared non-person entities · 1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162212
EPA staff distributed a chain of custody document to multiple federal and city agencies on May 15, 2002.
5 shared non-person entities · 1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362702
Chain-of-custody entry referencing a pre-bid meeting and building walkthrough for WTC-LBA scope.
5 shared non-person entities · 1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000454913
April 2000 memo outlining missing certifications for bulk sampling contractors.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000369025
Pre-bid meeting notice and background for 125 Cedar Street cleaning.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362669
Document outlining mandatory pre-bid meeting and scope for interior asbestos cleaning and air monitoring at 114 Liberty Street.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265486
Meeting notice and follow-up on cleanup at 125 Cedar Street, monitoring.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000369016
Pre-bid meeting details for asbestos air monitoring at 125 Cedar Street.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279035
Background on cleaning scope and on-site monitoring for asbestos abatement at 114 Liberty.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000234840
Contract document outlining the purpose to implement indoor dust sampling for seven contaminants including asbestos and lead in 14 buildings not affected by Ground Zero.
Similar indexed content
NYC-WTC_000234799
Chain of custody form and contract statement for indoor dust sampling to analyze contaminants including asbestos and lead in selected buildings.
Similar indexed content
NYC-WTC_000178137
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
Similar indexed content
Contract establishing procedures for collecting settled and airborne dust samples to analyze contaminants like asbestos, lead, and dioxins in selected buildings.
Similar indexed content
NYC-WTC_000178128
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
Similar indexed content