SECTION 02082
3. Before 7:45 am on Saturday’s and before 7:45 am on all regular days Monday through
Friday during the Summer, Christmas and Easter Vacation periods - $26.00/hr. pro rated.
4. When several Contractors are working at a school at the same time of day, each Contractor
will pay the Custodian-Engineer, Custodian or Cleaner in Charge his share of fee which
will be derived by dividing the Custodian Compensation fee per hour or minimum fee by
the number of Contractors.
5. The Contractor shall not pay the Custodian anything in excess of the above schedule of
payments.
Work Permits
Any work that may be conshued as disruptive to the student population and teachers during
regular school hours from 8:00 am - 3:00 pm, Monday thru Friday, must be conducted after 3:00
pm. Majority of the schools are open until 5:00 or 5:30 pm. If work will continue past the
regular closing time, the BOE requires that aU Consultants and Contractors purchase work
permits. Work permits are issued by the BOE to allow for the school to remain open after the
designated closing time during regular scheduled days in sessions, to open the schools on a
Saturday, Sunday and holidays, (provided that a Custodian is available to open, to be present
during the required time to complete the necessary work and to close the school.)
F. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE
PROVISIONS OF THE RULES AND REGULATIONS OF THE ASBESTOS CONTROL
PROGRAM AS PROMULGATED BY TITLE 15, CHAPTER 1 OF RCNY, FEDERAL LAW
(INCLUDING OSHA) AND NY STATE DEPARTMENT OF LABOR INDUSTRIAL CODE
RULE 56 CITED AS 12 NYCRR PART 56, WHICHEVER IS MORE STRINGENT AS PER
LATEST AMENDMENTS TO THESE LAWS AND AS MODIFIED HEREIN BY THESE
SPECIFICATIONS.
G. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FACT THAT CERTAIN
METHODS OF ASBESTOS ABATEMENT, INDICATED IN THE SPECIFICATIONS, ARE
COVERED BY PATENTS. TO DATE, PATENTS HAVE BEEN ISSUED WITH RESPECT
TO "NEGATIVE PRESSURE ENCLOSURE" OR "NEGATIVE-AIR" OR "REDUCED
PRESSURE" AND "GLOVE BAG".
H. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND SHALL HOLD THE
DEPARTMENT OF DESIGN AND CONSTRUCTION AND THE CITY HARMLESS FROM,
ANY AND ALL DAMAGES, LOSSES AND EXPENSES RESULTING FROM ANY
INFRINGEMENT BY THE CONTRACTOR OF ANY PATENT, INCLUDING BUT NOT
LIMITED TO THE PATENTS DESCRIBED ABOVE, USED BY THE CONTRACTOR
DURING PERFORMANCE OF THIS AGREEMENT.
I. All demolition and removal work and all other work which may create lead contaminated
dust, paint chips or debris shall be performed in accordance with the applicable regulations
but not limited to:
1. New York State Department of Environmental Conservation 6NYRR Subparts 371-376
02082-6
CITY_21 MCI 00_014563779
NYC-WTC_000454579