DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY
FEMA-1391 -DR-NY_____________ 061-51000-22 03/21/03 B
APPLICANT COUNTY
New York City, Board of Education (BoE) New York
ATC Associates conducted air and water testing al Stuyvesant High School between September 2001 and October 2002. The
parameters of the work included testing the air, dust and water for asbestos, lead, metals, respirable particulates and
portability . The BoE Application For Payment (AFP) numbers are located in the upper right comer of the attached sheets.
The first AFP had an illegible number and is designated as Payment 1 This AFP includes technical services, equipment and
sample analyses costs to conduct air quality testing from September 2001 to November 2001, as indicated on the AFP, for
BoE contract 3U75321. ATC Associates’ eligible contract work for this AFP was divided in three categories; labor,
equipment and testing. The total labor cost was $122,115.00. ATC tested air, dust and water for metals, asbestos, lead,
dioxin, PCB, particulate matter and portability, for a total cost of $193,142.20. Equipment used by ATC included various
types of air monitors tliat were placed around tlie school, as well as handheld monitors tliat tested for respirable particulates.
The equipment charges totaled $7,820.00. The total eligible contract cost for Payment 1 was $322,837.20.
AFP #000024084 includes technical services, equipment and sample analyses costs to conduct air quality testing from
December 2001 to March 2002, as indicated on the AFP, for BoE contract 3E75253. ATC Associates’ eligible contract work
for this AFP was divided in three categories; labor, equipment and testing. The total labor cost was $165,925.00. ATC tested
air, dust and water for metals, asbestos, lead, dioxin, PCB, particulate matter and portability, for a total cost of $453,264.00.
ATC performed a larger number of asbestos and metal tests tliat increased tlie analytical costs substantially for tliis period.
Equipment used by ATC included various types of air monitors that were placed around the school, as well as handheld
monitors that tested for respirable particulates. The equipment charges totaled $23,880.00. The total eligible contract cost
for AFP #000024084 was $643,069.
AFP #000011860 includes technical services, equipment and sample analyses costs to conduct air quality testing from March
to June 2002, as indicated on the AFP, for BoE contract 3E75253. ATC Associates’ eligible contract work for this AFP was
divided in three categories; labor, equipment and testing. The total labor cost was $115,022.50. ATC tested air, dust and
water for metals, asbestos, lead, dioxin, PCB, particulate matter and portability, for a total cost of $349,658.00. Due to the
fact that this AFP covers a larger time period than the previous two, ATC performed a larger number of asbestos and metal
tests that increased the analytical costs substantially for this period. Equipment used by ATC included various types of air
monitors that were placed around the school, as well as handheld monitors that tested for respirable particulates. The
equipment charges totaled $23,505.00. The total eligible contract cost for AFP #000011860 was $488,185.50.
AFP # 000018710 includes technical services, equipment and sample analysis costs to conduct air quality testing from July
to October 2002, as indicated on the AFP, for BoE contract 3E75253. Actual eligible work was complete as of September 10,
2002. The Applicant has provided a worksheet (pages 13 and 14 of the information attached to tliis PW) to re-calculate costs
to reflect only the costs incurred between July 2002 and September 10, 2002. ATC’s eligible contract work for this AFP
was divided in three categories; labor, testing and equipment. The total eligible labor cost was $7,452.50. ATC tested air,
dust and water for metals, asbestos, lead, dioxin, PCB, particulate matter and portability, for a total eligible cost of
$10,246.00. Equipment used by ATC included various types of air monitors that were placed around the school, as well as
handheld monitors that tested for respirable particulates. The equipment charges totaled $410. The total eligible contract
cost for AFP #000018710 was $18,108.50.
Prepared By: Mark A. Foreman, Project Officer