NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 114 pages

Asbestos regulatory documentation, NYC WTC 2006

Machine-extracted title · confidence 35%

Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.

NYC-WTC_000453278–000453391
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Table 2 ASBESTOS PROJECT AIR SAMPLING REQUIREMENTS Air Sampling Phase I B Phase II A Phase II B Phase II C Requirements Background Air Work Area Asbestos Final Cleaning & by Sampling Preparation Handling Clearance Air Asbestos Project & Air Sampling Air Sampling Regulated Abatement Sampling Work Area Size LARGE ASBESTOS Required Requirect^^* Required^ Required'-" PROJECT OR LARGE SiZE REGULATED ABATEMENT WORK AREA

5 Inside Regulated 1 per decontamination entrance/exit 5 Inside Regulated Abatement Work Area Abatement Work Area a 1 per negative air exhaust or per bank of a Minimum Samples 5 exhausts 5 Outside Regulated 5 Outside Regulated Required 2 at critical barriers Abatement Work Area Abatement Work Area in in Building/structure 1 outside the building/structure Building/structure

SMALL ASBESTOS Required Not Required Required^®' PROJECT OR SMALL SIZE REGULATED ABATEMENT WORK AREA

3 Inside Regulated 3 Inside Regulated 0 Abatement Work Area Abatement Work Area Minimum Samples a a 3 Outside Regulated 3 Outside Regulated Required Abatement Work Area Abatement Work Area in in Building/structure ® Building/structure <2’

MINOR ASBESTOS Not Required Not Required^ Required^^ 4) PROJECT OR MINOR SIZE REGULATED ABATEMENT WORK AREA

1 Inside Regulated 0 0 Abatement Work Area Minimum Samples a 1 Outside Regulated Required Abatement Work Area

Notes: (1) For sample location and total number required, see Subparts 56-6 through 56-9. (2) 1 sample outside the building/structure if entire building/structure is regulated abatement work area. (3) Required on glove bag failure or loss of integrity, or tent failure or loss of integrity. (4) Required for an Incidental Disturbance Project or if minor size regulated abatement work area is part of small or large asbestos project. (5) Required for all OSHA Class I and Class II Friable ACM asbestos projects.

12 NYCRR56 Subpart 4, Page 40

CITY_21MC100_011986108

NYC-WTC_000453318

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000453318Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →