NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Chain of custody, NY Labor Dept Part 56

Machine-extracted title · confidence 42%

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

NYC-WTC_000446470–000446582
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Table 2 ASBESTOS PROJECT AIR SAMPLING REQUIREMENTS Air Sampling Phase I B Phase II A Phase II B Phase II C Requirements Background Air Work Area Asbestos Final Cleaning & by Sampling Preparation Handling Clearance Air Asbestos Project & Air Sampling Air Sampling Regulated Abatement Sampling Work Area Size

5 Inside Regulated 1 per decontamination entrance/exit 5 Inside Regulated Abatement Work Area Abatement Work Area

5 exhausts 5 Outside Regulated 5 Outside Regulated Required 2 at critical barriers Abatement Work Area Abatement Work Area in in Building/structure ® 1 outside the building/structure Building/structure ®

SMALL ASBESTOS

SIZE REGULAI ED

3 Inside Regulated 3 Inside Regulated Abatement Work Area Abatement Work Area Minimum Samples & & 3 Outside Regulated 0 3 Outside Regulated Required Abatement Work Area Abatement Work Area in in Building/structure Building/structure ®

_______________ 1 Inside Regulated Abatement Work Area Minimum Samples 0 0 & Rom lirorl P f 1 Outside Regulated Abatement Work Area

Notes: (1) For sample location and total number required, see Subparts 56-6 through 56-9. (2) 1 sample outside the building/structure if entire building/structure is regulated abatement work area. (3) Required on glove bag failure or loss of integrity, or tent failure or loss of integrity. (4) Required for an Incidental Disturbance Project or if minor size regulated abatement work area is part of small or large asbestos project. (5) Required for all OSHA Class I and Class II Friable ACM asbestos projects. (6) During IIC final cleaning stage, air sampling as per Phase IIB is required. (7) One additional inside sample shall be required for every 5,000 sq. ft. above 25,000 sq. ft. of floor space within the regulated abatement work area.

12 NYCRR56 Subpart 4, Page 40

CITY_21MC100_011984409

NYC-WTC_000446510

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000446510Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →