NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 129 pages

Plan for Environmental Community Air Monitoring

Machine-extracted title · confidence 50%

Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.

NYC-WTC_000451808–000451936
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005

TABLE 13.4b Summary of Calibration Procedures for Fixed Laboratory Analyses Waste Sample Analysis - VOC, SVOC, Pesticides/Herbicides/PCB, Metals/ Mercury, pH Instrument Activity Frequency Acceptance Corrective SOP Criteria Action Ref.*

GCMSSVOC0117 DFTPP Tuning Every 12 horns SW846-8270C criteria Retune, re run for 00 GC/MS Initial cal. (5 stds) As needed CCCs <30%RSD, SPCCs > DFTPP criteria Semi­ Revision 1.4 method blank 1/20 per matrix 0.05 Rf; RSD avg.< 15% Recalibrate Volatiles No targets found Cont. calibration every 12 hours Re extract mblk CCCs @ <25%D; SPCCs> Rerun or recaVrenm all Surrogate stds. ALL 0.05Rf afftected samples Laboratory 1/20 per matrix Within Lab control limits Re-extract Control 1/20 per matrix Within Lab control limits Rcclibratc/ rerun all MS/MSD ALL samples Internal Standards -50 to +100% of 12 hour cal Reextract & rerun chk std. Rerun affected samples, dilute if matrix is issue

Hgl20998 Initial cal. (5 stds) As needed 0.995 Corr. Coeff. Recalibrate system Mercury/CV Revision 1.1 method blank Every 20 samples Not detected Renin affected samples AA Cont. calibration Every 10 samples +/- 21 r', Rerun affected samples Spike and Dup 1/20 samples Spike +/- 25%, Dup +/- 20% at Rerun spike/dup unless levels >5x Reporting Limit proven matrix Mfgs. Specs. interference

LCS 1/20 samples Rerun all affected samples Recalibrate ICP system ICPO31195 Initial calibration As needed +/- 10% ICP metals Rerun affected samples Revision 1.2 Cont. calibration Every 10 samples +/- 10% Rerun or qualify Calibration blanks Every 10 samples Not detected (<IDL) affected samples Calibrate with On use +- 0.05 units Recalibrate, if still > SOPWCpH Corrosivity/ pl 1-7, and pl 1-4 0.05 replace probe 010596 Rev. 1.6 buffers pH

100

CONFIDENTIAL, CITY_21MC100_007850010 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000451907

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451907Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

NYC-WTC_000427716

CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.

Similar indexed content

NYC-WTC_000444945

Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.

Similar indexed content

NYC-WTC_000440780

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

Similar indexed content

Compare copies and versions →