56-9.2 Air Sampling Requirements. (a) Personal Air Sampling. Air sampling shall be performed in the worker’s breathing zone, by the asbestos contractor for his personnel, as required by current OSHA regulations.
(b) Daily Air Sampling. Project air sampling shall be conducted daily for the full workshift for Large projects, until satisfactory clearance air results have been obtained for the regulated abatement work area. If more than one daily workshift is required to accomplish the work, air sampling shall be performed on each workshift. Air sampling is not required on days when there are no Phase II C activities.
(1) Number And Location Of Samples - Large Asbestos Projects. A minimum of five (5) samples shall be taken on a daily basis. The location of samples to be taken are the same as specified for Phase HA and I IB. (See Section 56-7.1 and Table 2 within Section 56-4.9)
(2) Work Stoppage Criteria During Phase II C Abatement Procedures. If air samples collected outside the regulated abatement work area, indicate airborne fiber concentrations at or above 0.01 fibers per cubic centimeter, or the established background level, whichever is greater, work shall stop immediately for inspection and repair of barriers and negative air ventilation systems as necessary. Clean up of surfaces outside of the regulated abatement work area using HEPA-vacuums and wet-cleaning methods shall be performed prior to resumption of abatement activities. A summary of clean up activities and the results of barrier inspections including any necessary repairs, shall be documented in the supervisor’s daily project log. Work methods shall be altered accordingly to reduce fiber concentrations to acceptable levels.
(c) Exemption From Daily Air Sampling. Daily air sampling is not required on exterior asbestos projects with abatement of non-friable ACM roofing, siding, caulking or glazing compound, tars, sealers, coatings or other NOB ACMs, unless the ACM is rendered friable during removal, or debris falls inside the building/structure.
(d) Clearance Air Sampling. There is no exemption from these requirements for Small or Large size negative pressure tent enclosure work areas. The amount of material abated within each regulated abatement work area determines the project size clearance air sampling requirements for each regulated abatement work area. (1) Aggressive Sampling Techniques. The following aggressive sampling techniques must be used for Phase II C clearance air sampling:
12 NYCRR56 Subpart 9, Page 88
CITY_21MC100_003243891
NYC-WTC_000451734
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411802
COSH-related NYC RO regulatory chapter on asbestos control.
17 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455928
CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
Similar indexed content
NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
Similar indexed content
NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
Similar indexed content
NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
Similar indexed content
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
Similar indexed content