NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

NYC-WTC_000233286

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000233286–000233396
Page image
Scanned page image, NYC-WTC_000233374
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

56-9.2 Air Sampling Requirements. (a) Personal Air Sampling. Air sampling shall be performed in the worker’s breathing zone, by the asbestos contractor for his personnel, as required by current OSHA regulations.

(b) Daily Air Sampling. Project air sampling shall be conducted daily for the full workshift for Large projects, until satisfactory clearance air results have been obtained for the regulated abatement work area. If more than one daily workshift is required to accomplish the work, air sampling shall be performed on each workshift. Air sampling is not required on days when there are no Phase II C activities.

(1) Number And Location Of Samples - Large Asbestos Projects. A minimum of five (5) samples shall be taken on a daily basis. The location of samples to be taken are the same as specified for Phase HA and I IB. (See Section 56-7.1 and Table 2 within Section 56-4.9)

(2) Work Stoppage Criteria During Phase II C Abatement Procedures. If air samples collected outside the regulated abatement work area, indicate airborne fiber concentrations at or above 0.01 fibers per cubic centimeter, or the established background level, whichever is greater, work shall stop immediately for inspection and repair of barriers and negative air ventilation systems as necessary. Clean up of surfaces outside of the regulated abatement work area using HEPA-vacuums and wet-cleaning methods shall be performed prior to resumption of abatement activities. A summary of clean up activities and the results of barrier inspections including any necessary repairs, shall be documented in the supervisor’s daily project log. Work methods shall be altered accordingly to reduce fiber concentrations to acceptable levels.

(c) Exemption From Daily Air Sampling. Daily air sampling is not required on exterior asbestos projects with abatement of non-friable ACM roofing, siding, caulking or glazing compound, tars, sealers, coatings or other NOB ACMs, unless the ACM is rendered friable during removal, or debris falls inside the building/structure.

(d) Clearance Air Sampling. There is no exemption from these requirements for Small or Large size negative pressure tent enclosure work areas. The amount of material abated within each regulated abatement work area determines the project size clearance air sampling requirements for each regulated abatement work area. (1) Aggressive Sampling Techniques. The following aggressive sampling techniques must be used for Phase II C clearance air sampling:

12 NYCRR56 Subpart 9, Page 88

CITY_21MC100_0 03235108

NYC-WTC_000233374

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000233374Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →