56-9.2 Air Sampling Requirements. (a) Personal Air Sampling. Air sampling shall be performed in the worker’s breathing zone, by the asbestos contractor for his personnel, as required by current OSHA regulations.
(b) Daily Air Sampling. Project air sampling shall be conducted daily for the full workshift for Large projects, until satisfactory clearance air results have been obtained for the regulated abatement work area. If more than one daily workshift is required to accomplish the work, air sampling shall be performed on each workshift. Air sampling is not required on days when there are no Phase II C activities.
(1) Number And Location Of Samples - Large Asbestos Projects. A minimum of five (5) samples shall be taken on a daily basis. The location of samples to be taken are the same as specified for Phase HA and I IB. (See Section 56-7.1 and Table 2 within Section 56-4.9)
(2) Work Stoppage Criteria During Phase II C Abatement Procedures. If air samples collected outside the regulated abatement work area, indicate airborne fiber concentrations at or above 0.01 fibers per cubic centimeter, or the established background level, whichever is greater, work shall stop immediately for inspection and repair of barriers and negative air ventilation systems as necessary. Clean up of surfaces outside of the regulated abatement work area using HEPA-vacuums and wet-cleaning methods shall be performed prior to resumption of abatement activities. A summary of clean up activities and the results of barrier inspections including any necessary repairs, shall be documented in the supervisor’s daily project log. Work methods shall be altered accordingly to reduce fiber concentrations to acceptable levels.
(c) Exemption From Daily Air Sampling. Daily air sampling is not required on exterior asbestos projects with abatement of non-friable ACM roofing, siding, caulking or glazing compound, tars, sealers, coatings or other NOB ACMs, unless the ACM is rendered friable during removal, or debris falls inside the building/structure.
(d) Clearance Air Sampling. There is no exemption from these requirements for Small or Large size negative pressure tent enclosure work areas. The amount of material abated within each regulated abatement work area determines the project size clearance air sampling requirements for each regulated abatement work area. (1) Aggressive Sampling Techniques. The following aggressive sampling techniques must be used for Phase II C clearance air sampling:
12 NYCRR56 Subpart 9, Page 88
CITY_21MC100_0 03235108
NYC-WTC_000233374
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
11 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
15 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
6 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112116
NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
10 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000097066
Notice of a mandatory pre-bid meeting and scope for asbestos abatement at 125 Cedar Street in August 2002.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107393
Document outlining mandatory pre-bid meeting and scope for asbestos abatement contractor work at a WTC building.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107194
Mandatory pre-bid meeting notice for asbestos abatement and cleaning at 125 Cedar Street scheduled for August 28, 2002.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
Similar indexed content
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similar indexed content
NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
Similar indexed content
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similar indexed content
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Similar indexed content