Asbestos inspection plan, NY Department of Labor

Machine-extracted title · confidence 41%

Asbestos Part 56 inspection reference document, NYC.

NYC-WTC_000451646–000451756
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SUBPART 56-6 PHASE 1B: BACKGROUND AIR SAMPLING

56-6.1 General Requirements. See Subpart 56-4 56-6.2 Number and Location of Background Air Samples. (a) Phase 1 B Background Sampling - Large Asbestos Project. Prior to asbestos abatement contractor mobilization and starting Phase II A, a minimum of five (5) samples shall be taken inside the intended regulated abatement work area, and a minimum of five (5) samples shall be taken outside of the intended regulated abatement work area within the building or structure in uncontaminated areas that are within ten (10) feet of the anticipated locations of isolation or critical barriers. If the entire building/structure is the intended regulated abatement work area, the five (5) air samples outside the regulated abatement work area shall be eliminated, and a minimum of one background ambient air sample shall be taken outside of the building or structure, as close as possible to the area where abatement work is to be conducted. See Table 2 in Section 56- 4.9 (b) Phase I B Background Sampling - Small Asbestos Project. Prior to asbestos abatement contractor mobilization and starting Phase II A, a minimum of three (3) samples shall be taken inside the intended regulated abatement work area and three (3) samples shall be taken outside of the intended regulated abatement work area within the building or structure in uncontaminated areas that are within ten feet of the anticipated locations of isolation or critical barriers. If the entire building/structure is the intended regulated abatement work area, the three (3) air samples outside the regulated abatement work area shall be eliminated, and a minimum of one (1) background ambient air sample shall be taken outside of the building or structure, as close as possible to the area where abatement work is to be conducted. See Table 2 in Section 56-4.9 (c) Phase I B Background Sampling - Minor Asbestos Project. Not Required. 56-6.3 Establishment of Background Level. The most elevated air sample result per group of inside work area or outside work area background air samples comprise the established background level(s) for that intended regulated abatement work area.

12 NYCRR56 Subpart 6, Page 47

CITY_21MC100_003243850

NYC-WTC_000451693

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451693Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →