NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos chain-of-custody, NYC WTC project, 2006

Machine-extracted title · confidence 50%

Asbestos chain-of-custody record for NYC WTC project, including state code reference.

NYC-WTC_000437549–000437661
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SUBPART 56-6 PHASE 1B: BACKGROUND AIR SAMPLING

56-6.1 General Requirements. See Subpart 56-4 56-6.2 Number and Location of Background Air Samples. (a) Phase 1 B Background Sampling - Large Asbestos Project. Prior to asbestos abatement contractor mobilization and starting Phase II A, a minimum of five (5) samples shall be taken inside the intended regulated abatement work area, and a minimum of five (5) samples shall be taken outside of the intended regulated abatement work area within the building or structure in uncontaminated areas that are within ten (10) feet of the anticipated locations of isolation or critical barriers. If the entire building/structure is the intended regulated abatement work area, the five (5) air samples outside the regulated abatement work area shall be eliminated, and a minimum of one (1) background ambient air sample shall be taken outside of the building or structure, as close as possible to the area where abatement work is to be conducted. (See Table 2 in Subpart 56- 4) (b) Phase I B Background Sampling - Small Asbestos Project. Prior to asbestos abatement contractor mobilization and starting Phase II A, a minimum of three (3) samples shall be taken inside the intended regulated abatement work area and three (3) samples shall be taken outside of the intended regulated abatement work area within the building or structure in uncontaminated areas that are within ten (10) feet of the anticipated locations of isolation or critical barriers. If the entire building/structure is the intended regulated abatement work area, the three (3) air samples outside the regulated abatement work area shall be eliminated, and a minimum of one (1) background ambient air sample shall be taken outside of the building or structure, as close as possible to the area where abatement work is to be conducted. (See Table 2 in Subpart 56-4) (c) Phase I B Background Sampling - Minor Asbestos Project. Not Required. 56-6.3 Establishment of Background Level. The most elevated air sample result per group of inside work area or outside work area background air samples comprise the established background level(s) for that intended regulated abatement work area.

12 NYCRR56 Subpart 6, Page 47

CITY_21MC100_012001672

NYC-WTC_000437596

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000437596Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →