16.1.1 Field Sampling Data Field sampling data will be verified daily by each person
performing the tasks. These data will be verified for completeness and correctness.
Field sampling data will also be independently reviewed daily by the AIRTEK Field
Sampling Coordinator, or designee, to ensure that records are complete, accurate, and
legible and verify that the sampling procedures are in accordance with the protocols
specified in the QAPP. Personnel performing the verification tasks will sign the field
notes after verification. Verification will include all field logbook notes, field
sampling forms, and COCs. Sample collection information will be transcribed
directly into the field logbook or onto standardized forms. If errors are made, results
will be legibly crossed out, initialed and dated by the person recording the data, and
corrected in a space adjacent to the original (erroneous) entry. Each member of the
field sampling team will be responsible for an internal verification of the transcribed
information. Daily external verification of the field records by the AIRTEK
Field Sampling Coordinator, or designee, will ensure that:
• Logbooks and standardized forms have been filled out completely and that the
information recorded accurately reflects the activities that were performed.
• Records arc legible and in accordance with good record keeping procedures,
i.e., entries are signed and dated, data are not obliterated, changes are initialed,
dated, and explained.
• Sample collection, handling, preservation, and storage procedures were
conducted in accordance with the protocols described in the QAPP, and that
any deviations were documented and approved by the appropriate personnel.
16.1.2 Field Analysis Data
Each member of the sampling team performing field analysis tasks will verify their
own data at the conclusion of each day for completeness and correctness. Field
analysis data will also be independently verified daily by the AIRTEK Field
Sampling Coordinator, or designee, to ensure that records are complete, accurate, and
legible and verify that the calibration procedures are in accordance with the protocols
specified in the QAPP. Personnel performing the verification tasks will sign the field
notes after verification. Verification will include all field logbook notes and
equipment calibration forms.
Field analysis information will be transcribed directly into the field logbook or onto
standardized forms. If errors are made, results will be legibly crossed out, initialed
and dated by the person recording the data, and corrected in a space adjacent to the
original (erroneous) entry. Each member of the field sampling team will be
responsible for an internal verification of the transcribed information. Daily external
verification of the field analysis records by the AIRTEK Field Sampling Coordinator,
or designee, will ensure that:
• Logbooks and standardized forms have been filled out completely and that the