NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

Quality Assurance Plan, Environmental Monitoring

Machine-extracted title · confidence 50%

QA plan for environmental air monitoring and waste management at NYC sites.

NYC-WTC_000451195–000451304
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Slreet/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

discrepancies with chain-ofoustody documentation, and potentially high concentration samples may be identified during sample log-in or just prior to analysis. Following consultation with laboratory analysts and Laboratory Section Leaders, it may be necessary for the Laboratory QA Manager to approve the implementation of corrective action. The analytical methods specify some conditions during or after analysis that may automatically trigger corrective action or optional procedures. These conditions may include dilution of samples, additional sample extract cleanup, automatic reinjection/reanalysis when certain QC criteria are not met, loss of sample through breakage or spillage, etc. If the corrective action is not clear, the Laboratory QA Manager must notify the AIRTEK Project Manager and AIRTEK QA Officer. All parties will decide and approve a subsequent corrective action procedure that will not adversely affect the achievement of project objectives. The analyst may identify the need for corrective action. The Laboratory Section Leader, in consultation with the staff, will approve the required corrective action to be implemented by the laboratory staff. The Laboratory QA Manager will ensure implementation and documentation of the corrective action. If the nonconformance causes project objectives not to be achieved, AIRTEK Project QA Officer will be notified. The AIRTEK Project QA Officer will notify the AIRTEK Project Manager, who in turn will contact all levels of project management for concurrence with the proposed corrective action. These corrective actions are performed prior to release of the data from the laboratory. The corrective action will be documented in both the laboratory’s corrective action files, and the narrative data report sent from the laboratory to AIRTEK. If the corrective action does not rectify the situation, the laboratory will contact the AIRTEK Project QA Officer, who will determine the action to be taken and inform the appropriate personnel. If necessary, a problem resolution audit will be conducted.

15.4 Data Validation and Data Assessment Non-Conformances

The need for corrective action may be identified during either data validation or data assessment. Potential types of corrective action may include data qualification or reinjection/reanalysis of samples by the laboratory. These actions are dependent upon whether the data to be collected is necessary to meet the required QA objectives. If the data validator or data assessor identifies a corrective action situation, the AIRTEK Project Manager will be responsible for informing the appropriate personnel. All corrective actions of this type will be documented by the AIRTEK Project Manager and maintained in the project files.

16.0 DATA REVIEW, VERIFICATION, VALIDATION, AND USABILITY

16.1 Data Review, Verification, and Validation

All data generated through field activities, or by the laboratory operation, will be reduced and/or validated prior to reporting. No data will be disseminated by ATRTEK or its subcontractors until it has been subjected to the procedures summarized below.

96

CITY_21MC100_0 03221749

NYC-WTC_000451290

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451290Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000440780

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

Similar indexed content

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

Compare copies and versions →