NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - September 29, 2005
PMio and PM2.5 Using a Met One E-BAM Continuous Monitor
Maintenance, testing, and inspection requirements for the E-BAM continuous monitors
are as follows.
• Audit flow system periodically by performing leak checks and flow audits.
• Clean inlets once a month.
• Service pump annually or more often as needed.
• Check the measurement system with the Zero and Span plates quarterly.
• Clean dust off of detector-sensing region quarterly during calibration audit.
13.1.2 Analytical Laboratory Equipment
This section describes the procedures and documentation activities that will be performed
to ensure that all fixed laboratory instrumentation and equipment are available and in
good working order when needed. Table 13-2 details the fixed laboratory instrument
maintenance, testing, and inspection requirements. Equipment maintenance logs must be
kept and equipment must be checked prior to use.
Tabfe 13-2. Msh'Hjaeai Testtag R€C|afe'eiii®ats for Fsserf
LaliTO-atory
Clean iHfeaiEzer, parcf- flsbasg, 4Ess«ssbS«=, cheeF. eckF aligEmssat, dessa
spray dasasfesr,
aad aiEs? wsfST esEtsasK isx'eh
SispsLS EGtsghEsg ptJHip es? seC coles:.
and wqES Cciwn in.-esK.;* cosss ireolace as issiassasyj-.
iiLSseC'Es mjscSss: issa sajjfpasrad'isser S?:, clfismiaEis:
the penssaltLc piaag ateisg fe wear sad seplaca as aesesssay._____________
KAHjfe<iG€:^S Chsci cs-ss.’ScaoHs.
Fleplace s&pss&btes.
iEjsSGDta peat SHaiasssisaca.
Ch^' tetaiE.
Pas&rrc led; checks
Clean ^sgtat.
PeS&<iQC/BCB wsaacSoas.
Sapsscs sS^essblss.
PsE&SEa EciecEoa, psrt :s3E3a5a2ssc®.
CJis; goSaasB.
sSssfeEE. leak dsscks.
asaa deiedssr..
EfesisK .F-L-snsHP.GC' C^etk ccssslYoss.
Sisp£3.te chi'iSOisbai.
PsEfcna iEjsEisEfflL f®H Ba^sKessBES.
Cl^s^EHas.
Pesfasai Sesk checki.
Clean dsiaase,._____________________________________________
AlsgE SEd Lheck s-ope C^toSe -Al?Qs ESS:.saspaase: daiSy.
MacssvxWAFS Check Sang;.. chice cjcS .ssSllDDRV barCe. g-egsre necc gieSe.pc, Slssk each
SEialyscal Sep.
S®?i feiWets SB 15 i EQS sssfetEssB,
Chsage STSgs., ssplsce taps, cSasK-chBrge 533.^312 ceS.
Sispecf tafes^ leplste fi-CESc pjegsire sew sacSs stsadards.
Aaased cssltat^ ef feslsEse by yEsede ssEtiSesfea.
M;s'!r5i:s2ij:sts: irSS si saiisSistdiiy QsssSjyAsnitsc!:* SifEiEiR-.
CITY_21MC100_0 03221730
NYC-WTC_000451271
OCR can misread numbers and units. Confirm readings against the page image before using them.