NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Quality Assurance Plan for Ambient Air Monitoring, Liberty Plaza

Machine-extracted title · confidence 58%

QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.

NYC-WTC_000440540–000440673
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 1, 2005 Lower Manhattan Development Corporation Page 94 of 124

PMio and PMxs Using a Met One E-BAM Continuous Monitor

Maintenance, testing, and inspection requirements for the E-BAM continuous monitors are as follows.

• Audit flow system periodically by performing leak checks and flow audits. • Clean inlets once a month. • Service pump annually or more often as needed. • Check the measurement system with the Zero and Span plates quarterly. • Clean dust off of detector-sensing region quarterly during calibration audit.

13.1.2 Analytical Laboratory Equipment

This section describes the procedures and documentation activities that will be performed to ensure that all fixed laboratory instrumentation and equipment are available and in good working order when needed. Table 13-2 details the fixed laboratory instrument maintenance, testing, and inspection requirements. Equipment maintenance logs must be kept and equipment must be checked prior to use.

Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed __________ Laboratory Analyses________________________________ Parameter/Instru ment _______________ Maintenance, Testing, and Inspection Activities_______________ Metals/lCP/MS Clean nebulizer, check pump tubing, replace disposables, check torch alignment, clean spray chamber. Inspect waste and rinse water container levels. Inspect roughing pump oil level and color. Remove and wipe down interface cones (replace as necessary). Inspect the injector and support adapter for cleanliness. Check the peristaltic pump tubing for wear and replace as necessary. PAHs/GC/MS Check connections. Replace disposables. Perform injection port maintenance. Clip column. Perform leak checks. Clean detector. PCBs/GC/ECD Check connections. Replace disposables. Perform injection port maintenance. Clip column. Perform leak checks. Clean detector

L2005-346 Rev. 1

CITY_21MC100_011977824

NYC-WTC_000440634

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000440634Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000441561

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

Compare copies and versions →