NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Quality Assurance Plan for Ambient Air Monitoring, Liberty Plaza

Machine-extracted title · confidence 58%

QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.

NYC-WTC_000440540–000440673
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: September 1, 2005 Lower Manhattan Development Corporation Page 39 of 124

Scaffolding at Noillieast Predominantly Does not Meet Represents Primarily Building Corner; Corner Downwind Building Setback Downwind Contributions; Floating Elevation Distances Also Represents Upwind/B ackground Contributions Some % of the Time. Also Represents Any Emissions in the Immediate Vicinity of the Scaffolding Monitoring Station at Elevation. Scaffolding at Southeast Predominantly Does not Meet Represents Primarily Building Corner; Corner Downwind Building Setback Downwind Contributions; Floating Elevation Distances Also Represents Upwind/B ackground Contributions Some % of the Time. Also Represents Any Emissions in the Immediate Vicinity of tlie Scaffolding Monitoring Station at Elevation. Roof Top Off Site Northeast Predominantly May Not Meet Represents Primarily 124 Liberty St- Downwind Setback Distance Downwind Contributions; FDNY 10-10 Criteria for Roof Also Represents House Placement Upwind/Background Contributions Some % of die Time. Roof Top Off Site- Southeast Predominantly May Not Meet Represents Primarily 90 Trinity Place Downwind Setback Distance Downwind Contributions; Criteria for Roof Also Represents Placement Upwind/Background Contributions Some % of the Time. Roof Top Off Southwest Predominantly May Not Meet Represents Primarily Site- 85 West St- Upwind Setback Distance Upwind/B ackground Marriott Hotel Criteria for Roof Contributions; Also Placement Represents Downwind Contributions Some % of the Time. Roof Top Off Site- South Predominantly May Not Meet Represents Primarily 110 Greenwich Downwind Setback Distance Downwind Contributions; Criteria for Roof Also Represents Placement Upwind/B ackground Contributions Some % of die Time.

L2005-346 Rev. 1

CITY_21MC100_0 11977769

NYC-WTC_000440579

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000440579Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000441561

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

Compare copies and versions →