NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

Quality Assurance Plan, Environmental Monitoring

Machine-extracted title · confidence 50%

QA plan for environmental air monitoring and waste management at NYC sites.

NYC-WTC_000451195–000451304
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

Trigger Levels for each of the target parameters. A summary listing of the Action Levels provided on a parameter-specific basis is shown in Table 6-3.

6.3.1 Decisions Based on Project Action Levels The following actions will be taken if there is an exceedance of any Target Air Quality Level. If there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated with the USEPA Site Specific Trigger Level will govern. In the event that the deconstruction project is shut down on account of an exceedance of an air quality action level, monitoring for all parameters will continue. The purpose of the continuation of monitoring will be to demonstrate that concentrations have been restored to acceptable levels.

6.3.2 Target Air Quality Levels 6.3.2.1 Definitions of Exceedances Any 24-hour PM2.5 and PM 10 value in excess of the Target Air Quality Level will be considered an “exceedance” and the actions described below will be taken. During the first week of sampling, any sample of an analyte, other than PM2.5 and PM10, in excess of 3 times the Target Air Quality level for that analyte, unless superseded by a USEPA Site Specific Trigger Level, will be considered an exceedance and the actions described below will be taken. Following the first week of sampling, a cumulative average will be established based initially on the first week’s results, to which will be added daily values as results are received from the laboratory. A cumulative average value for any analyte other than PM2.5 and PMio, in excess of the relevant Target Air Quality Level will be considered an exceedance and the actions described below will be taken.

6.3.2.2 Actions Based on Exceedances Exceedance at any of the twelve (12) monitoring locations will be handled as set forth in the September 2005 Air Monitoring Plan. Exceedances of an established Target Air Quality Level for any analyte calculated as provided above will result in an evaluation of engineering controls and work techniques in the source area. The evaluation of engineering controls and work techniques shall determine whether: (i) negative pressure is being maintained in active work areas at the required levels (ii) there are breaches in the containment in active work areas, and (hi) there are any visible emissions from the containment areas. In addition, the evaluation will consider other potential sources contributing to or causing the exceedance.

6.3.3 USEPA Site Specific Trigger Levels

6.3.3.1 Definition of Exceedances Any 24-hour value (eight-hour value in the case of asbestos and silica) in excess of the USEPA Site Specific Trigger Level will be considered an “exceedance” and the actions described below will be taken.

6.3.3.2 Actions Based on Exceedances Exceedance of USEPA Site Specific Trigger Levels will result in a stoppage of work associated with the exceedance until an evaluation of emission controls is performed and corrective action is in place. The USEPA Site Specific Trigger Levels are applicable to individual sample results. If

21

CITY_21MC100_003221674

NYC-WTC_000451215

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451215Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000440780

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

Similar indexed content

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

Compare copies and versions →