QA plan for ambient air monitoring, LMDC, 2005

Machine-extracted title · confidence 72%

Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.

NYC-WTC_000448520–000448651
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 1301 jberty Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Pages? of 124

13.0 TESTING, INSPECTION, MAINTENANCE AND CALIBRATION REQUIREMENTS

13.1 Instrument/Equipment Testing, Inspection, and Maintenance

13.1.1 Field Equipment

This section describes the procedures and documentation activities that will be performed to ensure that all field analytical instrumentation and equipment are available and in working order when needed. Instrument maintenance logs must be kept and instrumentation must be checked prior to use. The field instrument preventative maintenance program is designed to ensure the effective completion of the sampling effort and to minimize instrument downtime. The maintenance responsibilities for field instruments will be assigned to the TRC Field Sampling Coordinator. Field personnel will be responsible for daily field checks and calibrations and for reporting any problems with the instruments. The maintenance schedule will follow the manufacturer’s recommendations. Field personnel will also be responsible for ensuring that critical parts are included with the field instruments. Critical spare parts will be immediately available to reduce potential downtime. The inventory will primarily contain parts that are subject to frequent failure, have limited useful lifetimes, and/or cannot be obtained in a timely manner.

A spare set of equipment will be maintained on-site to facilitate network continuous operation in the event of equipment failure that cannot be remedied by in situ repair. Additional instruments and equipment will be available within 1-day shipment to avoid delays in the field schedule.

A list of equipment that will be in use each day for the 12 station network as well as the number of spare pieces of equipment on- is included in Attachment D.

Metals (TSP Filters)

Table 13-la summarizes the inspection, testing, and maintenance activities associated with the high volume samplers used to collect metals (TSP) samples.

Table 13-la. Maintenance, Testing, and Inspection Activities Associated with Metals (TSP filters) Collected with High Volume Samplers Acceptance Equipment Activity Corrective Action Criteria High volume sampler Single point flow check Within +20% of the Service high volume at normal operating flow flow rate indicated by sampler and perform rate weekly the high volume a new multi-point sampler calibration Power cords Check for crimps or No obvious damage Replace as necessary cracks Filter screen and Visually check daily No obvious deposits Wipe surface clean throat during sample recovery as needed procedure

CITY_21MC100_003238609

NYC-WTC_000448607

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448607Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →