QA plan for ambient air monitoring, LMDC, 2005

Machine-extracted title · confidence 72%

Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.

NYC-WTC_000448520–000448651
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 10 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 69 of 124

10.2.9 PMio

PMio will be determined by two separate methods. At each location, PMio will be determined by a non-reference method utilizing Met One’s E-BAM Mass Monitor, which is a real-time monitor. Anderson RAAS samplers will be used to collect PMio via the I S EPA standard reference method (40 CFR Part 50 Appendix J) at one location each day. An Anderson RAAS PMio sampler will be collocated along side the real-time PMio monitors as a QA check. The Anderson RAAS sampler will rotate on a monthly basis through all real-time PMw monitor locations for the duration of the monitoring program.

10.2.9.1 PMjo - Reference Method via Anderson RAAS samplers

Particulate samples whose aerodynamic diameter is < I O p will be collected using Andersen RAAS samplers operating in the PMm mode. All samples will be collected over an estimated twenty-four hour sampling interval at a prescribed flow rate of 16.67 liters/minute. This equates to a corrected air volume of 24 m^ per each twenty-four hour sampling event. Pre-weighed Teflon filters (47mm diameter) provided by the subcontracted laboratoiy will be placed in the RAAS sampler cassette prior to the start of each sampling event.

The sampler specification for the PMio sampler is contained in 40 CFR Part 50 Appendix J. This document specifies the PMio sampling limits, protocol, and instrument specifications. The RAAS systems perform all of the functions required or recommended in the instrument specification part of the standard. The inlet has a 10-micrometer (nominal) cutpoint. The inlet provides wind speed and direction independent sampling and removes particles larger than about 10 micrometers.

Before sampling, the filters are equilibrated to constant temperature and relative humidity conditions and weighed. After sampling, the filters are again equilibrated to the constant temperature and humidity conditions and weighed. The mass concentration is then calculated by dividing the weight of the particulate captured on the filter by the volume of air (at ambient conditions) that passed through the sampler. The flow rate is required to be maintained within 5% of 16.67 liters per minute with a coefficient of variation (a measure of the average short-term variation in flow in %) of less than 2%.

Equipment and supplies utilized with this sampling approach are as follows;

• Filters - Preweighed 47-mm Teflon® filters. Filters should be stored and transported in petri dishes.

• Forceps - Non-serrated forceps should be used to handle the 47-mm filters.

• Anderson RAAS PMio Sampler - A sampling system that meets the requirements of 40 CFR Part 50 Appendix J for the sampling of PMio when operated in the PMio mode. The

CITY_21MC100_003238591

NYC-WTC_000448589

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448589Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.