QA plan for ambient air monitoring, LMDC, 2005

Machine-extracted title · confidence 72%

Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.

NYC-WTC_000448520–000448651
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 6 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 22 of 124

The Initial Building Characterization Study that was released in September identified the need for supplemental testing to be perfonued in areas that were previously inaccessible prior to LMDC taking ownership of the building. Once LMDC acquired the building in August, 2004 the supplemental testing occurred in the building’s vertical shafts, interior wall interstitial spaces, HVAC system, cell system, curtain wall cavity, and the exterior. These test results were released in January, 2005 and were used as a basis for amending the deconstruction plan.

Cleaning and Deconstruction Work

In December, 2004 the LMDC released the draft Phase I Deconstmction Plan and formally submitted the plan to Federal, State and City Regulatory Agencies for review and comment. The proposed Deconstruction Plan submitted for review to the government regulators provided that the 130 Liberty Street building will be deconstructed in three phases:

• Phase I - Preparation Phase • Phase I - Asbestos and COPC Abatement and Removal • Phase II - Structural Deconstruction

The Phase I - Preparation Phase includes the erection of scaffolding and hoists on the full extent of the exterior of the building, construction of interior hoist vestibules, erection of sidewalk sheds and perimeter fencing, exterior negative pressure tent enclosures to implement the Pilot Program, localized roof, fagade and general exterior area clean-up and the removal of existing netting on the exterior of the building.

Phase I Asbestos and COPC Abatement and Removal Phase includes the cleaning and removal of all interior surfaces and non-structural elements within the building under containment. The clean-up and abatement will be conducted so that the building at 130 Liberty (Building) can be safely deconstructed to allow for redevelopment of the WTC Site. Phase I of the Deconstruction Project will occur while the work area is placed under negative pressure containment and includes the following general categories: (a) the general area cleanup of WTC dust and debris, (b) removal and disposal of installed porous and certain non-porous building materials and components, (c) cleaning and salvage of certain installed non-porous building equipment and components, (d) removal of building materials containing asbestos which were present in the Building prior to September 11*, 2001 (referred to herein as “ACBM”), primarily within the Building interior, (e) packaging of asbestos and other regulated waste including, but not limited to light bulbs, lighting ballasts, batteries, mercury-containing thermostats, etc. at generation points, movement of containers to the decontamination unit and movement of decontaminated containers to waste loading using an exterior hoist or crane, and (f) cleaning of exterior surfaces of the Building (i.e. building washdown).

During all Phase I activities, a minimum buffer zone of three floors initially for the top three floors and then two floors thereafter, will be maintained between the active abatement and cleanup (Phase I) area and the exterior abatement/structural demolition (Phase II) portion of the project. The proposed cleanup and abatement will be conducted so that the Building can be

CITY_21MC100_0 03238544

NYC-WTC_000448542

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448542Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

Compare copies and versions →