QA plan for ambient air monitoring, LMDC, 2005

Machine-extracted title · confidence 72%

Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.

NYC-WTC_000448520–000448651
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 15 Quality Assurance Project Plan Revision No.: 0 1301 I berly Street - NY, NY Date: September 7, 2005 Lower Manhattan Development Coi-poration Page 114 of 124

• Compliance with QA/QC objectives, • Equipment, instrumentation and supplies kept on reserve, • Instrument calibration and maintenance, • Data recording, reduction, review, and reporting, and • Cleanliness and housekeeping.

Preliminary results of the TSA will be discussed with the Laboratory Manager, Laboratory Project Manager, and Laboratory QA Manager during a verbal debriefing held at the facility. Assessment findings will be documented and reported as described in Section 15.2.

Data TSAs

Quarterly data audits will be performed by the TRC Project QA Officer or by a designated qualified individual. These audits will ensure all calculations are being performed properly for TEQs, BAP-equivalent concentrations, total PCBs, cumulative averages, etc. These audits will demonstrate the accuracy of the reported data and eliminate any potential global/systematic calculation errors.

15.2 Assessment Findings and Corrective Action Responses

The results of the field sampling and fixed laboratory TSAs will be documented in written reports; in addition, verbal debriefings will also be held at the conclusion of all audits. The reports will be prepared by the auditor and will describe the scope of the TSA, summarize audit findings, and recommend corrective action. The report will be distributed to the appropriate personnel for response: the TRC Field Sampling Coordinator will be responsible for responding to the field sampling TSA report, and the Laboratory Manager will be responsible for addressing the fixed laboratory TSA report. Significant issues that are discovered during the TSA and which could potentially affect data quality or usability will be brought to the immediate attention of the TRC Project Manager.

The response to the TSA reports will include a description of the corrective action(s) to be implemented, the identities of the personnel responsible for implementing the corrective action, and the schedule for implementation/completion. All responses must be completed within two weeks of issuing the TSA report. The response will be reviewed by the TRC Project QA Officer and/or TRC Project Manager and, if all issues have been addressed appropriately and in a timely manner, no further action will be required. In the event that the corrective action(s) are inadequate or inappropriate, follow-up activities, including additional audits, or discussions with the TRC Project Manager, will be conducted by the TRC Project QA Officer. The complete TSA report, including resolution of any deficiencies, will be included in the QA reports to management.

CITY_21MC100_0 03238636

NYC-WTC_000448634

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448634Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

NYC-WTC_000443239

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.

Similar indexed content

NYC-WTC_000447891

QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.