NYC 9/11 Public Portal Document
Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation
2.0 SAMPLING SITES 2.1 Network Design
Due to the unique circumstances associated with this deconstruction project three different types of monitoring sites are recommended for inclusion in the active monitoring network as follows:
• On-Site Street Level Stations- These locations essentially represent sidewalk settings situated around the perimeter of the building. Four (4) such stations will be included in the monitoring network as shown in Figure 1.
• Off-Site Elevated Stations- The proposed network will make use of monitoring sites in place at elevated locations above street level. It is LMDC’s intention to include four (4) such stations in the monitoring network. All four (4) of the proposed off-site rooftop sampling locations are identified in Figure 2.
• On-Site Scaffolding Elevated Stations- Air monitoring stations will also be located on the four sides of the scaffolding. These four “floating” monitoring stations will be re located on the scaffolding in ten floor increments (e.g. floors 30, 20 and 10) as the deconstruction work progresses from the roof level to ground level. Four (4) such stations will be included in the monitoring network (one on each side of the scaffolding) as shown in Figure 2. If Phase I Asbestos and COPC Abatement proceeds below these scaffold monitors, then additional air monitoring for metals utilizing NIOSH Methods will be conducted at the exhaust manifolds on the lowest elevation of the work area grouping.
2.2 Siting Criteria and Network Operations
The proposed full network will be comprised of twelve (12) stations in simultaneous operation at all times that building abatement and deconstruction activities are in progress, four (4) street level, four (4) off-site elevated, and four (4) on the scaffolding. The placement of sampling stations will follow USEPA and United States Army Corps of Engineers (ACOE) siting criteria for ambient particulate sampling systems to the extent possible. Strict adherence to these criteria at all stations may not be possible given the topography and logistics of the urbanized environment characteristic of the Lower Manhattan setting.
All of the stations will communicate with a central computer housed in the site vicinity. These on-site stations will collect data continuously and telemeter (wirelessly transmit) the data to the central computer. All of the monitoring stations in the immediate vicinity of the deconstruction site will monitor particulate as PMio and PM2.5 on a real-time basis. These data will be logged continuously at each of the sites as well as on the data logger contained in the on site computer center. These data will be stored and archived as 10-minute averages for each of the stations.
2-1
CITY_21MC100_003240831
NYC-WTC_000446770
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441904
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000231976
Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427865
Ambient air monitoring program document for 130 Liberty Street deconstruction project, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424704
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449611
Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421851
Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.
44 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441904
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424704
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
Similar indexed content
NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
Similar indexed content
NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
Similar indexed content
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
Similar indexed content
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
Similar indexed content