NYC 9/11 Public Portal Document
Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
2.0 SAMPLING SITES
2.1 Network Design
Due to the unique circumstances associated with this deconstruction project three different types
of monitoring sites are recommended for inclusion in the active monitoring network as follows:
• On-Site Street Level Stations- These locations essentially represent sidewalk settings
situated around the perimeter of the building. Four (4) such stations will be included in
the monitoring network as shown in Figure 1.
• Off-Site Elevated Stations- The proposed network will make use of monitoring sites in
place at elevated locations above street level. It is LMDC’s intention to include four (4)
such stations in the monitoring network. All four (4) of the proposed off-site rooftop
sampling locations are identified in Figure 2.
• On-Site Scaffolding Elevated Stations- Air monitoring stations will also be located on
the four sides of the scaffolding. These four “floating” monitoring stations will be re
located on the scaffolding in ten floor increments (e.g. floors 30, 20 and 10) as the
deconstruction work progresses from the roof level to ground level. Four (4) such
stations will be included in the monitoring network (one on each side of the scaffolding)
as shown in Figure 2. If Phase I Asbestos and COPC Abatement proceeds below these
scaffold monitors, then additional air monitoring for metals utilizing NIOSH Methods
will be conducted at the exhaust manifolds on the lowest elevation of the work area
grouping.
2.2 Siting Criteria and Network Operations
The proposed full network will be comprised of twelve (12) stations in simultaneous operation at
all times that building abatement and deconstruction activities are in progress, four (4) street
level, four (4) off-site elevated, and four (4) on the scaffolding. The placement of sampling
stations will follow USEPA and United States Army Corps of Engineers (ACOE) siting criteria
for ambient particulate sampling systems to the extent possible. Strict adherence to these criteria
at all stations may not be possible given the topography and logistics of the urbanized
environment characteristic of the Lower Manhattan setting.
All of the stations will communicate with a central computer housed in the site vicinity. These
on-site stations will collect data continuously and telemeter (wirelessly transmit) the data to the
central computer. All of the monitoring stations in the immediate vicinity of the deconstruction
site will monitor particulate as PMio and PM2.5 on a real-time basis. These data will be logged
continuously at each of the sites as well as on the data logger contained in the on site computer
center. These data will be stored and archived as 1 O-minute averages for each of the stations.
2-1