NYC 9/11 Public Portal Document
RJ IjceGroup, Inc.
350 Hochberg Road, Monroeville, PA 15146
Phone: (724) 325-1776 Fax: (724) 733-1799
Final Laboratory Report
TEM Air Analysis
RJ Lee Group, Inc. Report Date: 3/19/2005
350 Hochberg Road Sample Receipt Date: 3/19/2005
Monroeville, PA 15146 RJ Lee Group Job No.: TCN409139-26
USA Samples Received: 6
Method: Federal Register, 40 CFR, Part 763, October 30, 1987 Building: 4 Albany
Concentration
Date-Time Collected Filter Area Asbestos Analytical
RJLG Sample Sample Start Area Volume Analyzed Structures Sensitivity
Number Type Stop ■Sub Location I Comments- (mn?) (liter) (mirf) Chry Amph (S/mrrf) (S/cc)
5248319.HT Field 3/18/2005 - 14:00:00 (N/A) - Clearance sampling for 385 0.000 0.18286 0 0 <5.5 N/A
Blank 3/18/2005 - 14:00:00 phase 3 abatement. Floor 2. ”5.5 'N/A
Location 1. Field blank.
5248320.HT Area 3/18/2005 - 14:00:00 (N/A) - Clearance sampling for 385 1850.00 0.18286 1 0 0.001
3/18/2005 - 17:05:00 phase 3 abatement. Floor 2. '5.5 Ool
Location 1.
5248321.HT Area 3/18/2005 - 14:00:00 (N/A) - Clearance sampling for 385 1842.75 0.18286 10 0 54.7 0.011
3/18/2005 - 17:09:00 phase 3 abatement. Floor 2. ”5.5 Ool
Location 2.
5248322.HT Area 3/18/2005 - 14:00:00 (N/A) - Clearance sampling for 385 1881.75 0.18286 0 0 5.5 <0.001
3/18/2005 - 17:13:00 phase 3 abatement. Floor 2. '5.5 061
Location 3.
5248323.HT Area 3/18/2005 - 14:00:00 (N/A) - Clearance sampling for 385 1950.00 0.18286 3 0 16.4 0.003
3/18/2005 - 17:15:00 phase 3 abatement. Floor 2. ”5.5 oool
Location 4.
5249769.HT Area 3/18/2005 - 14:00:00 (N/A) - Clearance sampling for 385 1960.00 0.18286 10 0 54.7 0.011
3/18/2005 - 17:16:00 phase 3 abatement. Floor 2. ”5.5 Ooi
Location 5. Elevator shaft.
Authorized Signature:
Kimberly A. Allison, Manager - TEM Analysis
Notes:
1. Volumes provided by Deutsche Bank were used to calculate analytical results and sensitivities.
2. “<” indicates results less than analytical sensitivity. “—” indicates that sample was not analyzed.
3. Sample(s) for this project were analyzed at our: Monroeville, PA (NVLAP #101208-0, NY ELAP #10844) facility.
4. If RJ Lee Group, Inc. did not collect tire samples analyzed, tire verifiability of the laboratoiy's results ai e limited to tlie reported values.
5. Abbreviations: N/A-Not Applicable, Chry-Chrysotile Asbestos, Amph-Amphibole Asbestos, S-Structures.
6. Samples will be held for 90 days and then disposed of per Federal regulations.
7. These results are submitted pursuant to RJ Lee Group’s current terms and conditions of sale, including the company’s standard warranty and limitation
of liability provisions. No responsibility or liability is assumed for tlie maimer in which tliese results are used or interpreted.
Page 1 of 2
CITY_21MC100_0 03235702
NYC-WTC_000444928
OCR can misread numbers and units. Confirm readings against the page image before using them.