NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody/documentation for air monitoring around 133-135 Greenwich and 21-23 Thames
NYC-WTC_000444890–000444927OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 Rev 2 September 16, 2005
range of temperature and humidity. Before being weighed, both unexposed and exposed filters must be conditioned for at least 24 hours in this environment.
The exposed sample filters are transported in a cooler to limit the loss of volatile material, and are then kept in a refrigerator if they are cannot be weighed within 10 days of sampling (they still must be weighed within 30 days of sampling to be valid). Unexposed filters are taken out to the site under similar controlled conditions (usually in a cooler, although this is not necessary).
• Data requirements:
o Backup instruments, field staff, and supplies will be maintained throughout the monitoring duration to ensure continuous operation of monitoring stations and high data recovery.
o Data quality objective: 10% coefficient of variation. The coefficient of variation, CV, is the standard deviation as a fraction of the mean:
cv =^. JT
• Measures of Accuracy and Bias:
o Check of flow rate
o Audit by collocation with a portable ERM sampler.
Measures of Precision:
o Check of flow rate
o Collocation (see below).
Collocation:
o Monitors have a second monitor collocated at the same site, rotated between sites.
o The second ("duplicate") sampler runs every 6 days.
o Collocated particulate samplers must be less than 4 m apart but more than 1 m apart.
The PM2.5 sampler requires enhanced quality control measures because of its unique design and operational attributes. Examples of these QC measures include:
• Filter equilibration temperature control of +/-2 °C over 24 hours
• A pre-sampling filter weighing within 30 days of sampling period
• Retrieving the filter from the sampler within 96 hours of collection
• A post-sampling filter equilibration and re-weighing within 240 hours after the sampling period
28
CITY_21MC100_003235163
NYC-WTC_000444917
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
37 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
25 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Cover page for Part II of an environmental community air monitoring and deconstruction plan document prepared for the State of New York regarding 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similar indexed content
NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similar indexed content
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similar indexed content
NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similar indexed content
NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
Similar indexed content