NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody/documentation for air monitoring around 133-135 Greenwich and 21-23 Thames
NYC-WTC_000444890–000444927OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 Rev 2 September 16, 2005
The gravimetric analysis system consists of a laboratory balance and a human analyst trained to operate it. The weighing should take place in controlled temperature and humidity. Before being weighed, both unexposed and exposed filters must be conditioned for at least 24 hours in this environment.
The unexposed and exposed sample filters are transported in their cartridges to reduce the chance of contamination.
• Traceability of standards:
The following records of traceability, certification, etc. will be checked and maintained, along with criteria for the various calibrations, and audits:
o flow: orifices certified against a NIST-traceable displacement meter
o pressure drop: manometers certified NIST-traceable annually
o masses and balances NIST-traceable
o temperature and pressure NIST-traceable
• Calibrations: The sample collection staff performs a multi-point flow calibration of each particulate sampler using an orifice unit (quarterly, after maintenance or repairs and when indicated).
• Precision checks through collocation: A second sampler is placed the monitoring station.
Performance audits:
o Quarterly audits: An IH Quality Coordinator does a one-point flow audit quai'terly on all samplers, using a different orifice unit than the one used to calibrate the sampler.
• Data audit: Data Manager reviews all the data for anomalies.
3.4 Quality Assurance for PM2.5 Measures of accuracy, precision, and additional measurement quality objectives for PM2.5 measurements are summarized on Table A-2. These are measures to ensure the quality of data gathered using manual samplers of PM2.5. A manual PM2.5 monitoring system consists of a sampling system at the site, an analysis system at a central location and a transportation system to get the sample filters from one to the other.
The sampling system consists of a sampler (one or more at each site) with attached temperature and pressure instruments and a human operator who loads new (unexposed) filters into the sampler, programs it to sample each filter for 24 hours (normally midnight to midnight) on a specified day, and retrieves the exposed filters afterward. "Sequential" samplers may be used, capable of automatically changing filters to sample for several days in a row. Sequential samplers can run continuously, except for maintenance and QA checks.
The gravimetric analysis system consists of a microbalance in a climate-controlled weighing room and a human analyst trained to operate it. The weighing must take place within a narrow
27
CITY_21MC100_0 03235162
NYC-WTC_000444916
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
37 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
25 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Cover page for Part II of an environmental community air monitoring and deconstruction plan document prepared for the State of New York regarding 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 correspondence acknowledging receipt of a four-part revised environmental work plan for 133-135 Greenwich Street.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 correspondence acknowledging receipt of a four-part revised environmental work plan for 133-135 Greenwich Street.
Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similar indexed content
NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similar indexed content
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similar indexed content
NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similar indexed content
NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
Similar indexed content