Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody/documentation for air monitoring around 133-135 Greenwich and 21-23 Thames
NYC-WTC_000444890–000444927OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 Rev 2 September 16, 2005
Metals sampling and analysis will be performed following NIOSH 7300 “Elements by ICP,” except that ICP-MS will be utilized. A hot block/acid digestion will be utilized. Metals to be analyzed by TCP-MS and reported are: Antimony, Barium, Beryllium, Cadmium, Chromium, Copper, Lead, Manganese, Mercury (particulate). Nickel and Zinc.
Total Dust sampling and analyses will be conducted by NIOSH 0500.
Mercury:
In addition to metals monitoring for mercury particulate using air filters, real-time monitoring will be performed. The readings will be entered into the PDA program for inclusion with the daily download of sample collection data.
Real-time monitoring will be performed daily throughout the project. Mercury monitoring will be performed utilizing a Lumex RA 915-1- direct read instrument.
The Lumex RA915-I- will be utilized to obtain detection levels below established Site air contaminant criteria. At a ininimum, mercury readings will be taken twice a shift at the fixed air monitoring locations. At the discretion of the Environmental Consultant and as daily Site conditions may dictate, additional mercury readings may be taken.
Organic Compounds (Dioxin/PCBs/PAHs):
Organic compounds samples will be collected at specified points along the project schedule as follows:
1. On the first day of the Background Phase, one sample of each organic compound at each community monitoring location will be collected (three total samples per location). The samples from the location with the highest particulate readings will be analyzed. 2. Organic samples will be collected at each community monitoring location once a week on a different day of the work week during the Abatement Phase and Demolition Phase, until all days of the vrork week are used and then the same schedule will be repeated until project completion. Samples from the location with the highest particulate readings for that day will be submitted for analysis. This will result in the processing of the samples that have the best likelihood of representing the “worst case.” A total of three samples per week, one Dioxin, one PCB, one PAH will be analyzed. 3. Samples for organic compound analyses will be analyzed within fourteen days under normal laboratory analysis tum-around time
11
CITY_21MC100_003235146
NYC-WTC_000444900
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
37 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
37 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
25 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
26 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Cover page for Part II of an environmental community air monitoring and deconstruction plan document prepared for the State of New York regarding 30 West Broadway.
25 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425860
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 correspondence acknowledging receipt of a four-part revised environmental work plan for 133-135 Greenwich Street.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000450981
Chain-of-custody/document draft for environmental monitoring of Greenwich/Thames demolition.
Similar indexed content
NYC-WTC_000232127
Environmental community air monitoring plan prepared for the abatement and demolition of 133-135 Greenwich Street and 21-23 Thames Street in 2005.
Similar indexed content
CoC for environmental monitoring during 133-135 Greenwich and 21-23 Thames abatement.
Similar indexed content
NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similar indexed content
NYC-WTC_000095766
Part II of an environmental assessment focusing on community air monitoring during the remediation and deconstruction at 30 West Broadway.
Similar indexed content