QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

Additionally, the QAPP addresses the collection of HEPA vacuum samples from heating, ventilation, and air conditioning (FIVAC) units within buildings. The HEPA vacuum samples shall be used in this instance to collect composite samples to be analyzed for asbestos, MMVF, PAHs, lead, and to screen for the presence of WTC dust in the HVACs ; and, the HVAC filters shall be used to collect bulk samples to be analyzed for asbestos, MMVF, lead, PAHs and to screen for the presence of WTC dust in the HVACs.

Note that the various specifications and requirements (such as, but not limited to, sampling and analytical procedures, sample quantities, and QC activities) shall be periodically reviewed and may be changed to reflect project experience. This QAPP shall then be updated accordingly. These changes shall be signed by project management, attached to the QAPP, and distributed to all who have received the QAPP.

1.1 Distribution List

The Distribution List documents who shall receive copies of the approved QAPP and any subsequent revisions or amendments to the QAPP. The [contractor’s name] professionals listed below shall distribute the QAPP to all project team members and shall ensure that the project team members are familiar with any and all QA issues. A complete copy of the QAPP and any subsequent revisions shall be maintained on file at the [contractor’s location] office and shall be available to EPA Region II upon request. The Distribution List is identified as Table 1 in this QAPP.

1.2 Project Personnel Sign-Off Sheet

The Project Personnel Sign-Off Sheet documents that all key project personnel performing work have read the applicable sections of the QAPP and shall perform the tasks as described. For example, the laboratory manager who receives the QAPP shall have all supervisory personnel sign off on the applicable analysis sections of the QAPP before beginning sample analysis. Supervisory or oversight personnel are responsible for communicating the requirements of the applicable portions of the QAPP to those doing work. Although it is not always possible to identify people by name early in the planning stages, the project team shall identify by function (e.g., laboratory QC manager) all personnel who are to read and sign off on the applicable sections of the QAPP. Attachment 1 (Project Personnel Sign-Off Sheet) shows what information to include in the original QAPP and all revisions.

2.0 Project Organization

-2-

CITY_21MC100_002649175

NYC-WTC_000442665

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442665Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →