NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 50 pages

QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

Item Assessment Activity

Usability Report Discuss and compare overall precision, accuracy/bias, representativeness, comparability, completeness, and sensitivity for each matrix, analytical group, and concentration level. Describe limitations on the use of project data if criteria for data quality indicators are not met.

16.0 Streamlining Data Review

Streamlining data review refers to a process of eliminating some requirements for validation that are deemed no longer necessary to preserve data integrity. Streamlining data review is meant to reduce time and costs while still confirming the quality of the data. Thus, any streamlining option shall recognize that:

- the types and amounts of data reviewed shall be sufficient to develop a clear understanding of the quality of the data; - the practice of reviewing a subset of data (or a data indicator such as a successful PT sample) as a substitute for reviewing all data shall be reevaluated if problems are detected that call into question the quality of the data set; and - streamlining data review occurs when efficiencies are created in the data review process by the following actions: looking at a subset of data that is representative of a larger universe, and examining the data in an alternative manner (e.g., through the use of batch-specific PT samples).

Any decisions with regards to streamlining shall only occur in consultation with EPA’s QATS contractor and in consultation with, and the approval of, the EPA Site Coordinator as to the nature and type of streamlining to be conducted.

17.0 Generic Quality Assurance Project Plan for World Trade Center (WTC) Residue Sampling

The methodology to be used for a WTC dust screening method is currently a work in progress.

The sampling QAPP “Generic Quality Assurance Project Plan for WTC Residue Sampling, New

-38-

CITY_21MC100_002649211

NYC-WTC_000442701

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442701Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →