QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

The Primary Contractor shall make a determination of the adequacy of data, based on the results of validation and verification, for the decisions being made. The usability step involves assessing whether the process execution and resulting data meet project quality objectives documented in the QAPP.

Table 9 below describes the objectives, scope, steps, and output of data review associated with each process term.

Table 9. Data Review Process Term Objective Scope Data Review Step Output

Verification Review to see if data — Sampling I. Completeness check Verification Report required for the project - Analysis Package includes are available. all documentation

Validation — Assess and document — Sampling Ila. Check compliance with Validation Report the performance of the - Analysis method, procedure, and Includes qualified field sample collection contract requirements. data process. Ilb. Compare with Assess and document measurement performance the performance of the criteria from the QAPP analytical process.

Usability Assess and document - Sampling III. Assess usability of data by Usability Report Assessment usability to meet project - Analysis considering project quality quality objectives. objectives and the decision to be made.

Laboratory analytical results shall be assessed by the data reviewer for compliance with required precision, accuracy, completeness, representativeness, and sensitivity.

The Primary Contractor shall perform the usability assessment to ensure that the PQOs are understood and the full scope is considered. The items listed in Table 10 below are examples of specific items that shall be considered during this project under the usability assessment.

Table 10. Usability Assessment

-36-

CITY_21MC100_002649209

NYC-WTC_000442699

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442699Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →