QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

All project data and information must be documented in a format that is usable by project personnel. Therefore, the QAPP describes how project data and information shall be documented, tracked, and managed, from generation in the field to final use and storage, in a manner that ensures data integrity, defensibility, and retrieval.

11.1 Project Documentation and Records

All appropriate data, original field forms/data sheets, and chain-of-custody forms shall be collected and completed in accordance with the instructions contained in the contract with the Primary Contractor and shall be submitted to EPA. This information shall be provided via Forms II Lite (F2L) or Scribe or an alternative electronic format that is approved by EPA. Lead and PAH samples and copies of necessary documentation shall be hand delivered daily to [name of lab, address, and phone number]. Asbestos and MMVF samples and copies of necessary documentation shall be hand delivered daily to [name of lab, address, and phone number]. Samples to screen for the presence of WTC dust and copies of necessary documentation shall be shipped daily by courier for next day delivery to [name of lab, address, and phone number]. All bulk dust samples and copies of necessary documentation shall be shipped daily by courier for next day delivery to [name of lab, address, and phone number[.

The Primary Contractor shall also maintain a copy of each deliverable and all field documentation submitted under this project for 365 days. The Primary Contractor shall review all deliverables prior to its submission to the EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors.

11.2 Data Package Deliverables

All contractors are required by contract to maintain the field data, laboratory data and analysis results at the site that performed the analysis for 365 days after EPA acceptance of test results. Lab shall provide a copy of all sample calculations with each deliverable.

11.3 Data Reporting Formats

Any manual entry of data by the Primary Contractor or subcontractor into a database shall be verified by the following procedure. This procedure is to be followed from the inception of the project for all spreadsheets sent by the contractor to EPA for entry into the database.

a. The contractor’s data analyst enters the validated data into a spreadsheet format. b. The contractor’s analyst prints out a hard copy of the spreadsheet and places it into the raw data file. c. A second contractor data review analyst then reviews every entry that is made into the

-31-

CITY_21MC100_002649204

NYC-WTC_000442694

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442694Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →