NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 50 pages

QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

EPA’s (Quality Assurance and Technical Support) QATS contractor is responsible for designing and implementing a program to review all laboratory data analysis to achieve the following objectives: Data Review, Validation and Verification, and Reconciliation with User Requirements.

The EPA shall notify occupants and building owners as specified in Section 2.2 (Communication Pathways). Neither the primary contractor nor any of the subcontractors are authorized to release residential and non-residential area sampling results.

2.4.2 Primary Contractor Responsibilities

The Primary Contractor will revise the draft QAPP as necessary to prepare the final QAPP. The Primary Contractor and its subcontractors involved in the activities at buildings under this project are responsible for completing a background check on their employees before beginning on-site work and for screening unacceptable candidates from the pool of on-site workers. The background checks shall be evaluated in accordance with the Robert T. Stafford Disaster Relief and Emergency Assistance Act (the Stafford Act), 42 USC Section 5121. Contractors are required to maintain records of background checks for four (4) years and to make them available to the EPA when requested. At a minimum, the background check must include:

1. Law enforcement checks (five (5) years)

2. Professional license and certification

The Primary Contractor shalladapt, adopt and follow the Quality Assurance Project Plan prepared by EPA for all environmental data collection activities performed for this project. All appropriate data, original field forms/data sheets, and chain-of-custody forms shall be collected and completed in accordance with the instructions contained in the contract and provided to EPA.

The Primary Contractor shall have available sufficient qualified personnel and sufficient quantities of sampling equipment to provide the amount and type of samples required for this project. The Primary Contractor must follow the established quality assurance activities for all phases of field sampling work and laboratory quality control checks.

The Primary Contractor or its Sub-Contractors are responsible for conducting personal air monitoring of the cleanup workers and arrange for the sample analysis in accordance with Occupational Safety and Health Administration (OSHA) regulations. The Primary Contractor shall provide the test results to the EPA and OSHA for their evaluation. Additionally, the Primary Contractor or its Sub-Contractors shall provide test results to its employees.

The Primary Contractor or its Sub-Contractors shall collect the samples from the buildings. The

-6-

CITY_21MC100_002649179

NYC-WTC_000442669

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442669Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →