NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Greenwich/Thames plan: Environmental monitoring

Machine-extracted title · confidence 32%

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites.

NYC-WTC_000442410–000442543
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005

n n n n n n Table 7-2. Abatement Phase: Asbestos and COPC Abatement and Removal Sampling and Analysis Summary Location Paranietei-(s) Sample Frequency Analysis Method

Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Scaffolding/Street 1. Asbestos Each Day (asbestos and silica l.TEM/SEM Level/School Auditorium 2. Silica are sampled during work shift 2.XRD Roof (3 Locations) 3. Metals Each Day (24 lir. Basis) 3. ICP/MS 4. PCDDs/PCDEs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodatedCarbon Trap/CVAFS 8. PMio Continuously “Real-Time” Each 8. EBAM/Gravimetric 9. PM2.5 Day (PMio and PM2.5 on 24 hour 9. EBAM/Gravimetric basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed bi­ weekly)

Table 7-3. Demolition Phase - Structural Deconstruction Phase Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method

Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Scaffolding/Street 1. Asbestos Each Day (asbestos and silica l.TEM/SEM Lcvcl/School Auditorium 2. Silica arc sampled during work shift 2.XRD Roof (3 Locations) 3. Metals Each Day (24 lir. Basis) 3. ICP/MS 4. PCDDs/PCDEs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury (total) 7. lodatedCarbon Trap/CVAFS 8. PMio Continuously “Real-Time” Each 8. EBAM/Gravimetric 9. PM2.5 Day (PMio and PM2.5 on 24 hour 9. EBAM/Gravimetric basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis witli location changed bi­ weekly)

30

CONFIDENTIAL, CITY_21MC100_007849806 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000442439

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442439Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000451808

Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

NYC-WTC_000420513

Plan for environmental air monitoring around The Greenwich Street and Thames Street sites.

Similar indexed content

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

Compare copies and versions →