Chain-of-custody style scope of work for 125 Cedar Street asbestos cleanup monitoring.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗DEP scope of work for asbestos interior cleaning and monitoring at 125 Cedar Street.
NYC-WTC_000442087–000442091OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
New York City Department of Environmental Protection Bureau of Environmental Compliance
Monitoring Contractor Scope of Work for 125 Cedar Street, Manhattan
Background
A follow-up visit to 125 Cedar Street revealed debris and significant dust accumulation present on surfaces throughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.
Purpose
The Monitoring Contractor shall provide personnel experienced, trained, and certified in envuonmental sampling and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories and a penthouse-5,000 to 6,000 square feet in total). The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoring Contractor shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, crystalline silica and mercury.
An accredited laboratory shall perform all sample analyses.
The Work shall be performed 24 hours per day, seven (7) days per week
Air Monitor!ng/Construction Inspection Ser\ices
Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring Contractor shall provide individuals certified as project monitors and air sampling technicians to perlorm daily air sampling and inspections from the commencement of the project through final air clearance sampling. The Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work ai’ea preparation and cleaning phases of the building interiors.
Qualifications
Project Monitoring The Project Monitors must posses valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 25 asbestos abatement projects. A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
1 of 5
CITY_21MC100_003232635
NYC-WTC_000442087
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000447374
Chain-of-custody style scope of work for 125 Cedar Street asbestos cleanup monitoring.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442641
Scope of work for asbestos surface monitoring and interior cleaning oversight at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434544
Scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000430690
Follow-up scope for environmental sampling and asbestos monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441728
Scope of work for asbestos abatement monitoring and clearance sampling.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445849
New York DEP scope-of-work document for 125 Cedar Street remediation.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434571
Duplicate scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441311
Scope of work for asbestos sampling and air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444042
Chain-of-custody scope of work for asbestos air monitoring and debris cleanup at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435224
Scope for on-site asbestos air monitoring during interior cleaning at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000430681
Scope of work for asbestos cleaning and monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455813
Scope of work for monitoring and cleanup of 125 Cedar Street interior; asbestos sampling included.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000447374
Chain-of-custody style scope of work for 125 Cedar Street asbestos cleanup monitoring.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000430690
Follow-up scope for environmental sampling and asbestos monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434544
Scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441728
Scope of work for asbestos abatement monitoring and clearance sampling.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444042
Chain-of-custody scope of work for asbestos air monitoring and debris cleanup at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445849
New York DEP scope-of-work document for 125 Cedar Street remediation.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000447374
Chain-of-custody style scope of work for 125 Cedar Street asbestos cleanup monitoring.
Similar indexed content
NYC-WTC_000442641
Scope of work for asbestos surface monitoring and interior cleaning oversight at 125 Cedar Street.
Similar indexed content
NYC-WTC_000434544
Scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000430690
Follow-up scope for environmental sampling and asbestos monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000441728
Scope of work for asbestos abatement monitoring and clearance sampling.
Similar indexed content