NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
76 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.
NYC-WTC_000441561–000441677OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 2 Quality Assurance Project Plan Revision No.: 0 1301 jberty Street - NY, NY Date: August 2005 Lower Manhattan Development Coi-poration Page 3 of 116
8.2.5 Sensitivity.... 49 8.2.6 Completeness 50 9.0 NON-DIRECT MEASUREMENTS (SECONDARY DATA) 51 10.0 FIELD MONITORING REQUIREMENTS............................ 52 10.1 Monitoring Process Design......................................................... 52 10.1.1 Meteorological Data Collection 52 10.2 Monitoring Methods......................... 52 10.2.1 Metals (TSP Filters)....................................................................... 52 10.2.2 Mercury (Gas)................................................................................ 53 10.2.3 Asbestos.......................................................................................... 54 10.2.4 Respirable Crystalline Silica and Dust........................................ 55 10.2.5 Polychlorinated Dibenzodioxins (PCDDs) and Polychlorinated Dibenzofurans (PCDFs)................................................................ 56 10.2.6 Polychlorinated Biphenyls (PCBs) .............................................. 58 10.2.7 Polycyclic Aromatic Hydrocarbons (PAHs)................................ 60 10.2.8 Mercury (Total).............................................................................. 61 10.2.9 PM 10...................................................... 62 10.2.9.1 PMio - Reference Method via Anderson RAAS samplers 62 10.2.9.2 PMio - Continuous Monitoring of PMio via Met One E-BAM Samplers.... 63 10.2.10 PM2.5...................................................................................................... 63 10.2.10.1 PM2.5 - Reference Method via Anderson RAAS Samplers......... 63 10.2.10.2 Continuous Monitoring of PM2.5 via Met One E-BAM Samplers 65 10.3 Field Quality Control 65 10.3.1 Field Blanks/Trip Blanks.... 65 10.3.2 Cooler Temperature Blanks 65 10.3.3 Field Duplicates.................. 65 10.3.4 Field Spikes......................... 66 10.3.5 Breakthrough Checks......... 66 10.3.6 Media Certification Checks 66 11.0 ANALYTICAL REQUIREMENTS 67 11.1 Analytical Methods............................................................................................................ 67 11.1.1 Fixed Laboratory Analytical Methods and SOPs............. 67 11.1.2 Fixed Laboratory Analytical Method/SOP Modifications 67 11.1.2.1 PAH Extraction by EPA Method TO-13A and Analysis by SW-846 Method 8270C........................................................................................ 67 11.1.2.2 Dioxin Extraction by EPA Method TO-9A......................................... 67 11.1.2.3 Asbestos Analyses by TEM (AHERA)................................................ 68 11.1.2.4 Metals Analysis by SW-846 Method 6020A....................................... 69 11.2 Analytical Quality Control............................... 69 11.2.1 Field Analytical QC................................. 69 11.2.2 Fixed Laboratory QC............................... 70 11.2.2.1 Method Blanks/Preparation Blanks 70
L2005-346 Rev. 1
CITY_21MC100_003243409
NYC-WTC_000441564
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000449648
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
76 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444248
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
75 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447031
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449908
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447891
QA plan for ambient air monitoring at 130 Liberty Street, Sept 7, 2005.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443239
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, LMDC.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448520
Quality assurance plan for ambient air monitoring during deconstruction at Liberty Street.
73 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428324
Draft QA project plan for Ambient Air Monitoring Program at 130 Liberty Street deconstruction (Aug 2005).
74 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427221
Draft QA Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, TRC scope, Aug 2005.
74 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451508
Quality assurance plan for ambient air monitoring at the Liberty Street deconstruction site, Sep 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440540
QA Plan document for ambient air monitoring at the 130 Liberty Street deconstruction project, Sept 2005.
73 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.
Similar indexed content
NYC-WTC_000438373
QA plan for ambient air monitoring at 130 Liberty Street deconstruction site, Sept 2005.
Similar indexed content
QA plan document for ambient air monitoring program for Liberty Street deconstruction.
Similar indexed content
QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.
Similar indexed content