NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 117 pages

Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 16 Quality Assurance Project Plan Revision No.: 0 130 1 iberly Street - NY, NY Date: Augnst 2005 Lower Manhattan Development Coi-poration Page 109 of 116

16.0 DATA REVIEW, VERIFICATION, VALIDATION, AND USABILITY

16.1 Data Review, Verification, and Validation

All data generated through field activities, or by the laboratory operation, will be reduced and/or validated prior to reporting. No data will be disseminated by TRC or its subcontractors until it has been subjected to the procedures summarized below.

16.1.1 Field Sampling Data

Field sampling data will be verified daily by each person performing the tasks. These data will be verified for completeness and correctness. Field sampling data will also be independently reviewed daily by the TRC Field Sampling Coordinator to ensure that records are complete, accurate, and legible and verify that the sampling procedures are in accordance with the protocols specified in the QAPP. Personnel performing the verification tasks will sign the field notes after verification. Verification will include all field logbook notes, field sampling forms, and COCs.

Sample collection information will be transcribed directly into the field logbook or onto standardized forms. If errors are made, results will be legibly crossed out, initialed and dated by the person recording the data, and corrected in a space adjacent to the original (erroneous) entry. Each member of the field sampling team will be responsible for an internal verification of the transcribed information. Daily external verification of the field records by the TRC Field Sampling Coordinator will ensure that:

• Logbooks and standardized forms have been filled out completely and that the information recorded accurately reflects the activities that were performed. • Records are legible and in accordance with good record keeping procedures, i.e., entries are signed and dated, data are not obliterated, changes are initialed, dated, and explained. • Sample collection, handling, preservation, and storage procedures were conducted in accordance with the protocols described in the QAPP, and that any deviations were documented and approved by the appropriate personnel.

16.1.2 Field Analysis Data

Each member of the sampling team performing field analysis tasks will verify their own data at the conclusion of each day for completeness and correctness. Field analysis data will also be independently verified daily by the TRC Field Sampling Coordinator to ensure that records are complete, accurate, and legible and verify that the calibration procedures are in accordance with the protocols specified in the QAPP. Personnel performing the verification tasks will sign the field notes after verification. Verification will include all field logbook notes and equipment calibration forms.

L2005-346 Rev. 1

CITY_21MC100_0 03243515

NYC-WTC_000441670

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441670Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

Compare copies and versions →