NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 129 pages

Plan for Environmental Community Air Monitoring, Greenwich/Thames

Machine-extracted title · confidence 45%

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

NYC-WTC_000440780–000440908
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Slreet/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005

PAHs/GC/MS Check connections. Replace disposables. Perform injection port maintenance. Clip column. Perform leak checks. Clean detector. Pesticides, Herbicide, &PCBs/GC/ECD Check connections. Replace disposables. Perform injection port maintenance. Clip Column,. Perform leak checks. Clean detector.

Dioxins & Furans/HRGC/HRMS Check connections. Check connections. Replace disposables. Perform injection port maintenance. Clip Column,. Perform leak checks. ^doandetecton ______________________________________ Asbestos/TEM Align and check TEM scope. Calibrate for Al/Cu EDX response daily.______________________________________ Silica/XRD Check daily or Si-primary peak, displacement, and detector resolution._________________________________________ Mercury/CVAE S Check fitting, rinse and refill DDIW bottle, prepare new pretraps, blank each analytical trap. Soak bubblers in 1% KOH solution. Change traps, replace lamps, clean/charge quartz cell. Inspect tubing, replace fittings, prep new stock standards. Mercury/CVAA Check fitting, rinse and refill DDIW bottle, prepare new pretraps, blank each analytical trap. Soak bubblers in 1% KOH solution. Change traps, replace lamps, clean/charge quartz cell. Inspect tubing, replace fittings, prep new stock standards. Corrosivity/pH meter ClonditiqmprobewhenJIuntuatinn^ _______________ PM 10 Annual calibration of balance by outside certiFication.(^) PM 25 Annual calibration of balance by outside certification.(^)

Annual calibration records will be maintained by the Quality Assurance Officer.

90

CITY_21MC100_0 03220230

NYC-WTC_000440869

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000440869Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

NYC-WTC_000444945

Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →